Skip to main content
GSEnergy Efficiency - DomesticMyanmarGeneral Methodologyv2.1

GS1729 Myanmar Stoves Campaign - SLOW LIFE in Myanmar - VPA No. 002

GS-322 ↗ · current registry ID: GS2394

#68of 1329 in Industrial#1of 25 in Myanmar#159of 1801 in Gold Standard (GS)

6.0/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
6.0

Audit Analysis

The Myanmar Stoves Campaign is a Gold Standard cookstove efficiency project with VVB-confirmed additionality, a quantified 5% leakage deduction, and documented safeguards including FPIC and a grievance mechanism. However, the absence of a stated buffer pool, a project-specific baseline, and a verified ERR figure for the monitoring period create moderate uncertainty. The project delivered roughly 55% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating a conservative (under-delivery) position that reduces over-crediting risk.

Red Flags

  • Crediting period contradiction: the monitoring report references 2015-2017 while the validation report (2023) states 2022-2027, creating ambiguity about which period is active and whether credits from the earlier period are still valid
  • Buffer pool percentage and reversal event history are not stated in any available document, leaving permanence risk unquantified
  • Usage rate was assumed at 100% in the ex-ante estimate but verified at only 84% in the monitoring report, a 16-percentage-point gap that could inflate claimed reductions if not fully corrected
  • Total verified ERR for the monitoring period is not stated in the extracted record, preventing independent verification of the 11,117 tCO₂e claimed figure

Credit Vintages

IssuedRetiredAvailable
2015
1,9701,9700
2016
7,8417,094747
2017
1,3061,3060
Total11,11710,370747

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

5% quantified deduction

Baseline

Project-specific, reassessment date not stated

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents