GS1729 - Myanmar Stoves Campaign - Soneva in Myanmar - VPA No. 006
GS-1018 ↗ · current registry ID: GS5662
#176of 1329 in Industrial#4of 25 in Myanmar#319of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Myanmar with VVB-confirmed additionality and a quantified 5% leakage deduction, but significant concerns around permanence (no buffer pool, reversal events unaddressed) and a large gap between the assumed 100% usage rate and the 60.4% verified in the 2020 monitoring report. Multiple contradictions across documents on ERR figures, usage rates, and crediting period dates reduce confidence in the data record.
Red Flags
- Usage rate assumed at 100% in the PDD but verified at only 60.4% in the 2020 monitoring report, a 40-percentage-point gap that signals potential over-crediting if not fully adjusted in claimed ERR
- Reversal events are explicitly 'not addressed' and no buffer pool percentage is stated, leaving permanence risk for cookstove replacement or abandonment unmitigated
- The lifetime ex-ante ERR differs by 28% between the PDD (66,227 tCO₂e) and the 2018 monitoring report (47,584 tCO₂e), and the claimed ERR dropped from 7,564 to 3,249 tCO₂e between the 2019 and 2020 monitoring reports, indicating declining project performance
- Crediting period is stated as open-ended ('2016-05-01 — null') in the 2018 verification report but as '2022-03-08 to 2027-03-07' in the 2023 validation report, creating ambiguity about which period governs
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 5,182 | 4,798 | 384 | |
| 2017 | 2,591 | 2,591 | 0 | |
| 2018 | 5,042 | 5,042 | 0 | |
| 2019 | 4,687 | 4,644 | 43 | |
| 2020 | 1,083 | 1,062 | 21 | |
| Total | 18,585 | 18,137 | 448 |
Risk Indicators
VVB-confirmed combined test
reversal unaddressed
5% quantified deduction applied
Project-specific; no reassessment date
FPIC, grievance, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →