Skip to main content
GSEnergy Efficiency - DomesticMyanmarGeneral Methodologyv2.1

GS1729 Myanmar Stoves Campaign - Soneva in Myanmar - VPA No. 010

GS-1471 ↗ · current registry ID: GS6600

#1068of 1329 in Industrial#23of 25 in Myanmar#1510of 1801 in Gold Standard (GS)

4.2/ 10
Integrity
3.5
Transparency
5.0
Claim Safety
4.5
Documentation
4.0

Audit Analysis

This Gold Standard cookstove project in Myanmar has a named VVB (SustainCERT) and a stated monitoring period, but is undermined by 13 material findings, 13 corrective actions, and nine cross-document contradictions. The verification report (2023) does not confirm additionality by the VVB, the baseline is project-specific with no reassessment date, no buffer pool is in place, and the assumed 100% usage rate diverges sharply from the 75.45% verified rate. The project's data reliability is further weakened by a large discrepancy in the ex-ante lifetime estimate (9,584 vs 47,922 tCO₂e) and a leakage deduction that is 0% in the verification report but 5% in the contemporaneous monitoring report.

Red Flags

  • Additionality was NOT verified by the VVB according to the 2023 verification report, contradicting the 2023 validation report which recorded it as verified
  • 13 material findings in the verification report, including corrections to baseline calculations, survey sample data, EFb values, and net-benefit computations
  • 13 corrective actions required, spanning ODA declaration, stakeholder consultation documentation, LSC timing, and emission-reduction transfer agreements
  • Ex-ante lifetime estimate differs by a factor of five between the PDD (47,922 tCO₂e) and the 2020 monitoring report (9,584 tCO₂e)
  • Leakage deduction is 0% in the verification report but 5% in the monitoring report dated 15 days earlier

Credit Vintages

IssuedRetiredAvailable
2018
6,5356,5350
2019
9,2169,098118
2020
6,9574,5372,420
2021
5,6971,9523,745
2022
4,61804,618
2023
2590259
Total33,28222,12211,160

Risk Indicators

Additionality

Investment test present but not VVB-verified per 2023 verification report

Permanence

no reversal events reported

Leakage

0% deduction in verification report contradicted by 5% in monitoring report

Baseline

Project-specific baseline; no reassessment date found in available documents

Safeguards

Grievance mechanism and benefit sharing documented; FPIC not conducted; 13 corrective actions on stakeholder consultation

Double-claim

CORSIA eligibility and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents