This Gold Standard cookstove PoA in Malawi has confirmed additionality and a quantified 10% leakage deduction, but is undermined by 18 material findings, unaddressed reversal risk, no stated buffer pool, and a claimed ERR figure that exceeds the ex-ante lifetime estimate. Multiple contradictions between documents (FNRB units, monitoring method, crediting period) reduce confidence in the data record. The project is functional but carries moderate over-crediting and permanence risk.
Red Flags
- Claimed ERR of 386,180 tCO2e exceeds the ex-ante lifetime estimate of 329,223 tCO2e, indicating potential over-crediting
- 18 material findings reported in the verification report, including 8 corrective action requests, 1 compliance finding, and 4 further action requests
- Reversal events explicitly 'not addressed' and no buffer pool percentage stated for a cookstove project with inherent device-failure risk
- No usage and monitoring surveys or WBTs were conducted in Malawi in 2019 for household/domestic cookstoves (per verification report finding)
- Total verified ERR is not found in the extracted record, leaving the claimed figure unverified
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 5,699 | 5,586 | 113 | |
| 2014 | 76,011 | 74,491 | 1,520 | |
| 2015 | 78,765 | 78,264 | 501 | |
| 2016 | 74,997 | 74,997 | 0 | |
| 2017 | 51,337 | 51,337 | 0 | |
| 2018 | 716 | 14 | 702 | |
| Total | 287,525 | 284,689 | 2,836 |
Risk Indicators
Combined test, VVB-confirmed
mixed evidence / unresolved risk
10% quantified deduction
Project-specific, reassessed 2016
FPIC, grievance mechanism, benefit sharing
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →