Audit Analysis
A Gold Standard cookstove project in Rwanda with VVB-confirmed additionality but significant gaps in permanence safeguards, leakage treatment, and verified emission data. The verification report flags that actual reductions are considerably below ex-ante estimates, and two corrective actions remain open. Multiple contradictions between documents—particularly on leakage justification and safeguards—reduce confidence in the data record.
Red Flags
- Leakage deduction of 0% with contradictory justification: the verification report (Feb 2024) states leakage was 'not addressed' while the monitoring report (Feb 2024) claims it was 'deemed negligible'—no quantified analysis supports either position
- Material finding in the verification report: actual SDG 13 emission reductions are 'considerably below estimated values due to lower usage rate and KPT results', indicating ex-ante assumptions were overly optimistic
- No buffer pool percentage stated and reversal events explicitly 'not addressed'—a material gap for a cookstove project where devices can break, be replaced, or fall out of use
- Two open corrective actions (FAR#1 and FAR#2) require the project developer to update the TDR database for three specific cookstoves before the next verification cycle
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 3,589 | 3,589 | 0 | |
| 2018 | 7,465 | 7,465 | 0 | |
| 2019 | 6,060 | 6,060 | 0 | |
| 2020 | 5,545 | 5,511 | 34 | |
| 2021 | 5,069 | 4,969 | 100 | |
| 2022 | 3,887 | 3,810 | 77 | |
| 2023 | 6,511 | 6,426 | 85 | |
| 2024 | 2,519 | 2,519 | 0 | |
| Total | 40,645 | 40,349 | 296 |
Risk Indicators
VVB-confirmed combined test
reversal not addressed
0% deduction, contradictory justification
Project-specific; no reassessment date
Grievance mechanism present; FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →