GS5047 VPA23 African Improved Cookstoves and Clean Water Programme: Nyagatare Safe Water Project III

GS-1594 ↗ · current registry ID: GS7148

#974of 1329 in Industrial#87of 139 in Rwanda#1401of 1801 in Gold Standard (GS)

4.4/ 10
Integrity
5.0
Transparency
4.0
Claim Safety
4.5
Documentation
3.5

Audit Analysis

A Gold Standard safe-water (borehole) project in Rwanda with VVB-confirmed additionality and a conservative national-default FNRB, but undermined by multiple cross-document contradictions (ERR figures, leakage justification, safeguards), a 0% leakage deduction with inconsistent rationale, no stated buffer pool, and low extraction confidence that casts doubt on the reliability of the underlying data. The project name mismatch between the header (VPA23 / Project III) and the extracted verification report (VPA21 / Project I) further weakens confidence that the documents reviewed actually pertain to this specific project.

Red Flags

  • ERR contradiction: the verification report (2022) records 47,308 tCO₂e while a separate monitoring report (2022) records 62,570 tCO₂e — a 32% discrepancy that is unexplained in the available documents.
  • Leakage justification is contradictory: the 2018 PDD states leakage was 'deemed negligible' while the 2023 monitoring report states it was 'quantified', yet the deduction applied is 0% in both cases.
  • Project name mismatch: the header identifies VPA23 / Nyagatare Safe Water Project III, but the verification report's project_name field reads VPA21 / Nyagatare Safe Water Project I (GS 6189), raising the possibility that documents from a different project in the same PoA were used.
  • Three corrective actions were required by the VVB, including capping the usage rate at 90% and correcting inconsistent baseline values for SDG6 and SDG13, indicating the submitted data did not fully comply with the approved design.

Credit Vintages

IssuedRetiredAvailable
2019
9,0669,0660
2020
4,6834,6776
2021
11,5199,1352,384
2022
9,4049,217187
2023
4,09004,090
2024
2,13102,131
Total40,89332,0958,798

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

low inherent reversal risk (water)

Leakage

0% deduction; contradictory justifications across PDD and MR

Baseline

Project-specific; reassessment timing not stated

Safeguards

FPIC and grievance documented in VR; contradicted by MR

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents