Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS5047 VPA26 African Improved Cookstoves and Clean Water Programme: Nyagatare Safe Water Project VI

GS-1603 ↗ · current registry ID: GS7395

#907of 1329 in Industrial#77of 139 in Rwanda#1325of 1801 in Gold Standard (GS)

4.5/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.5
Documentation
4.0

Audit Analysis

This Gold Standard water project in Rwanda has VVB-confirmed additionality and a named verification body, but is undermined by numerous material findings (GPS verification failures, potential double counting, 12 boreholes removed, downtime rising to 9%), multiple corrective actions requiring caps and exclusions, a project-specific baseline with no buffer pool, and contradictory leakage justifications across documents. The VVB reduced claimed emissions reductions by roughly 25%, indicating the initial methodology was overly generous.

Red Flags

  • Borehole GPS locations could not be verified; some showed bare land or trees instead of infrastructure (verification report, Dec 2023)
  • Potential double counting of users due to overlapping 1 km radii of nearby boreholes (verification report)
  • 12 boreholes removed from the project database during the monitoring period; average downtime rose from 1.2% to 9.0% (monitoring report)
  • Leakage justification contradicts itself: one monitoring report states 'deemed negligible' while an earlier one states 'quantified' (contradiction between 2023-07-14 and 2023-12-20 reports)
  • Multiple corrective actions required including capping water withdrawal, capping usage rate at 90%, and excluding households beyond 1 km — indicating the initial methodology over-credited

Credit Vintages

IssuedRetiredAvailable
2019
3,8353,565270
2020
4,6834,6776
2021
11,3529,1632,189
2022
8,9238,746177
2023
3,00703,007
2024
1,50301,503
Total33,30326,1517,152

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

12 boreholes removed; downtime rising

Leakage

0% deduction; contradictory justification across reports

Baseline

Project-specific; no reassessment date stated

Safeguards

FPIC and grievance present but documentation inconsistent

Double-claim

CORSIA and CCP status both not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents