Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS5047 VPA31 African Improved Cookstoves and Clean Water Programme: Nyagatare Safe Water Project XI

GS-1583 ↗ · current registry ID: GS7400

#1151of 1329 in Industrial#113of 139 in Rwanda#1605of 1801 in Gold Standard (GS)

4.0/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
3.5
Documentation
3.5

Audit Analysis

This Gold Standard water project in Rwanda has VVB-confirmed additionality and a conservative FNRB, but is undermined by multiple material findings (unverified GPS locations, potential double-counting of users, survey attribution issues), a 32% discrepancy between claimed and monitored ERR figures, and a 0% leakage deduction whose justification is contradicted between the PDD and the monitoring report. Four corrective actions remain open, and the low extraction confidence across 23 documents limits assurance in the underlying data.

Red Flags

  • Potential double counting of users due to overlapping 1 km radii of nearby boreholes, flagged in the verification report material findings
  • 32% discrepancy between the verification report ERR (47,308 tCO₂e) and the monitoring report ERR (62,570 tCO₂e) for the same reporting cycle
  • Borehole GPS locations could not be verified; some showed bare land or trees instead of infrastructure
  • Four corrective actions remain open, including recollecting GPS coordinates and capping the usage rate at 90%
  • Leakage justification is contradictory: the PDD (2018) states 'deemed negligible' while the monitoring report (2023) states 'quantified', yet the deduction is 0%

Credit Vintages

IssuedRetiredAvailable
2019
3,8352,0641,771
2020
4,6834,6776
2021
11,08511,03055
2022
10,0009,800200
2023
3,83803,838
2024
1,81501,815
Total35,25627,5717,685

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, no reassessment date

Safeguards

FPIC and grievance present but docs conflict

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents