GS5047 VPA47 African Improved Cookstoves and Clean Water Programme: Gishwati – Mukura Forest Conservation Project I
GS-2729 ↗ · current registry ID: GS10740
#625of 1329 in Industrial#43of 139 in Rwanda#952of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard improved-cookstove project in Rwanda has a VVB-confirmed additionality assessment and a verified ERR that matches its claim for the 2024–2025 monitoring period, but the verification report lists 34 corrective actions and 7 material findings that point to persistent data-quality and documentation-consistency problems. The absence of a buffer pool, a 0% leakage deduction with contradictory justifications across reports, and an upward fNRB revision from 0.77 to 0.89 introduce moderate over-crediting and permanence risk. Overall the project is functional but carries elevated data-reliability concerns that temper confidence in the claimed reductions.
Red Flags
- 34 corrective actions required in the 2025 verification report, spanning data inconsistencies, missing evidence, and methodology clarifications — an unusually high volume that signals weak monitoring data quality
- No buffer pool or permanence mechanism is documented for a cookstove project where hardware failure (mud-hearth damage noted in material findings) and stove abandonment are realistic reversal risks
- Leakage justification is contradictory: the 2025 verification report states 'deemed negligible' while the 2024 verification report states 'quantified', with a 0% deduction in both cases
- fNRB was revised upward from 0.77 (PDD, 2020) to 0.89 (2025 VR), a 15.6% increase in the non-renewable baseline fraction that directly inflates claimed reductions
- CCP status and CORSIA eligibility are both unstated in available documents, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 4,402 | 4,402 | 0 | |
| 2022 | 9,912 | 8,173 | 1,739 | |
| 2023 | 9,913 | 842 | 9,071 | |
| 2024 | 10,000 | 0 | 10,000 | |
| Total | 34,227 | 13,417 | 20,810 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, contradictory justifications across reports
Project-specific baseline, fNRB revised upward, no reassessment date
Grievance mechanism and benefit sharing noted, FPIC not found
CCP and CORSIA status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →