Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS5047 VPA47 African Improved Cookstoves and Clean Water Programme: Gishwati – Mukura Forest Conservation Project I

GS-2729 ↗ · current registry ID: GS10740

#625of 1329 in Industrial#43of 139 in Rwanda#952of 1801 in Gold Standard (GS)

4.9/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

This Gold Standard improved-cookstove project in Rwanda has a VVB-confirmed additionality assessment and a verified ERR that matches its claim for the 2024–2025 monitoring period, but the verification report lists 34 corrective actions and 7 material findings that point to persistent data-quality and documentation-consistency problems. The absence of a buffer pool, a 0% leakage deduction with contradictory justifications across reports, and an upward fNRB revision from 0.77 to 0.89 introduce moderate over-crediting and permanence risk. Overall the project is functional but carries elevated data-reliability concerns that temper confidence in the claimed reductions.

Red Flags

  • 34 corrective actions required in the 2025 verification report, spanning data inconsistencies, missing evidence, and methodology clarifications — an unusually high volume that signals weak monitoring data quality
  • No buffer pool or permanence mechanism is documented for a cookstove project where hardware failure (mud-hearth damage noted in material findings) and stove abandonment are realistic reversal risks
  • Leakage justification is contradictory: the 2025 verification report states 'deemed negligible' while the 2024 verification report states 'quantified', with a 0% deduction in both cases
  • fNRB was revised upward from 0.77 (PDD, 2020) to 0.89 (2025 VR), a 15.6% increase in the non-renewable baseline fraction that directly inflates claimed reductions
  • CCP status and CORSIA eligibility are both unstated in available documents, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2021
4,4024,4020
2022
9,9128,1731,739
2023
9,9138429,071
2024
10,000010,000
Total34,22713,41720,810

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, contradictory justifications across reports

Baseline

Project-specific baseline, fNRB revised upward, no reassessment date

Safeguards

Grievance mechanism and benefit sharing noted, FPIC not found

Double-claim

CCP and CORSIA status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents