GS5047 VPA48 African Improved Cookstoves and Clean Water Programme: Gishwati – Mukura Forest Conservation Project II
GS-2730 ↗ · current registry ID: GS10741
#382of 1329 in Industrial#27of 139 in Rwanda#604of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Rwanda with VVB-confirmed additionality and no reversal events, but undermined by an extensive list of 30+ corrective actions flagging data-quality and monitoring-process weaknesses, a 0% leakage deduction with contradictory justifications across documents, and the absence of a stated buffer pool. The project's conservative fNRB correction and microscale cap provide some claim-safety margin, but the overall MRV robustness is below standard.
Red Flags
- 30+ corrective actions required in the 2026 verification report, spanning data consistency, missing evidence, calculation errors, and sampling-design confidence — indicating a systemic MRV quality problem
- Leakage justification is contradictory: the verification report (Apr 2026) states 'quantified' while the monitoring report (Apr 2026) states 'deemed negligible', yet the deduction is 0% in both
- Verification report dated 2026-04-29 covers a monitoring period ending 2024-12-31, a delay of over 16 months that raises timeliness concerns
- Stove cracks reported (Dec 2024) with a corrective action to repair, but no buffer or reversal mechanism is documented to cover potential loss of function
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 1,685 | 1,685 | 0 | |
| 2022 | 9,912 | 9,796 | 116 | |
| 2023 | 9,910 | 5,040 | 4,870 | |
| 2024 | 10,000 | 0 | 10,000 | |
| Total | 31,507 | 16,521 | 14,986 |
Risk Indicators
VVB-confirmed combined test
stove cracks reported
0% deduction; contradictory justification
Project-specific; reassessment timing unstated
Present per VR but absent in MR and PDD
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →