Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS5047 VPA50 African Improved Cookstoves and Clean Water Programme: Ibanda – Makera Forest Cook Stove Project I

GS-2815 ↗ · current registry ID: GS10826

#840of 1329 in Industrial#67of 139 in Rwanda#1240of 1801 in Gold Standard (GS)

4.6/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.0
Documentation
5.0

Audit Analysis

This Gold Standard cookstove project in Rwanda has VVB-confirmed additionality and consistent usage rates, but is undermined by twelve corrective actions, a significant fNRB discrepancy between documents (0.77 vs 0.98), unresolved leakage treatment contradictions, and material findings indicating verification delays and incomplete surveys. The project's claims are not yet robustly supported by the monitoring evidence.

Red Flags

  • Twelve corrective actions required by SustainCERT, including errors in installation dates, crediting period alignment, usage rate transfer errors, and undefined baseline parameters (Nb,y and Pb,y)
  • fNRB value contradicts between the verification report (0.77) and the monitoring report (0.98) — a 27% swing that directly inflates emission reductions
  • Material finding: verification for the 2020–2021 period was never submitted to SustainCERT due to delays, and 2022 surveys had not been carried out at the time of reporting
  • Leakage treatment is inconsistent: the verification report deems leakage negligible (0% deduction) while the monitoring report references a quantified approach

Credit Vintages

IssuedRetiredAvailable
2020
1471470
2021
8,8858,84738
2022
9,4939,304189
2023
80679016
Total19,33119,088243

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

low inherent risk for cookstoves

Leakage

0% deduction, justification contradicts between documents

Baseline

Project-specific baseline; reassessment date not stated

Safeguards

FPIC and grievance confirmed in verification report; absent from PDD

Double-claim

CCP and CORSIA status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents