GS5047 VPA52 African Improved Cookstoves and Clean Water Programme: Ibanda – Makera Forest Cook Stove Project III
GS-2817 ↗ · current registry ID: GS10828
#178of 1329 in Industrial#16of 139 in Rwanda#321of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Rwanda with VVB-confirmed additionality and a standard methodology, but undermined by a project-specific baseline, contradictory leakage justifications across documents, a false FPIC finding, and twelve material corrections flagged in the verification report. The absence of a stated buffer pool, ex-ante lifetime ERR figure, and CORSIA/CCP status leaves meaningful evidence gaps that limit confidence in the credit's robustness.
Red Flags
- FPIC was not conducted (stated as false in the verification report), a significant safeguard gap for a community cookstove deployment in Rwanda
- Leakage justification is contradictory: the PDD (2020) describes leakage as 'quantified' while the verification report (2022) states it was 'deemed negligible' with a 0% deduction
- Twelve material findings in the verification report required corrections to installation dates, crediting periods, usage-rate calculations, and baseline parameter definitions, indicating weak initial documentation quality
- The monitoring report (Nov 2023) reports 69,668 tCO2e while the verification report (Nov 2023) verifies only 58,350 tCO2e for the same period — an 18% discrepancy
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 3,882 | 3,865 | 17 | |
| 2022 | 9,494 | 9,305 | 189 | |
| 2023 | 806 | 790 | 16 | |
| Total | 14,182 | 13,960 | 222 |
Risk Indicators
Combined test, VVB-confirmed
no reversal events recorded
0% deduction; PDD vs VR justification conflict
Project-specific; no reassessment date stated
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →