Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS5047 VPA64 African Improved Cookstoves and Clean Water Programme: Ibanda – Makera Forest Cook Stove Project IX

GS-2954 ↗ · current registry ID: GS10995

#545of 1329 in Industrial#36of 139 in Rwanda#843of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.0
Transparency
5.0
Claim Safety
4.5
Documentation
5.5

Audit Analysis

A Gold Standard cookstove project in Rwanda with a named VVB (SustainCERT) and a verified monitoring period, but undermined by six inter-document contradictions on key parameters (ERR, FNRB, leakage, safeguards), a project-specific baseline with no documented reassessment, and the absence of any buffer pool or permanence mechanism. The VVB confirmed the claimed ERR of 58,350 tCO₂e after reducing the monitoring report's higher figure of 69,668, but the lack of a lifetime ex-ante estimate prevents a meaningful pro-rata delivery check.

Red Flags

  • Six contradictions between the verification report, monitoring report, and PDD on leakage treatment, ERR, FNRB, safeguards, grievance mechanism, and crediting period dates
  • No buffer pool or permanence mechanism documented for a cookstove project where stove failure or abandonment is a realistic reversal risk
  • Leakage deduction of 0% justified only as 'deemed negligible' while a separate monitoring report entry describes it as 'quantified' — the basis for the zero deduction is unclear
  • Baseline is project-specific with no documented reassessment date, and the PDD appears to be a repurposed CDM PoA form rather than a purpose-built Gold Standard document

Credit Vintages Exhausted

IssuedRetiredAvailable
2022
8368360
2023
5215210
Total1,3571,3570

Risk Indicators

Additionality

Combined test present but VVB confirmation not explicitly documented

Permanence

reversal risk unaddressed

Leakage

0% deduction with contradictory justification (negligible vs quantified)

Baseline

Project-specific baseline; no reassessment date documented

Safeguards

Grievance mechanism and benefit sharing confirmed by VVB; FPIC not stated

Double-claim

CORSIA and CCP status both unstated; dual-channel risk unassessed

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents