Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS5047 VPA76 African Improved Cookstoves and Clean Water Programme: Gishwati – Mukura Forest Conservation Project IV

GS-2971 ↗ · current registry ID: GS11012

#841of 1329 in Industrial#68of 139 in Rwanda#1241of 1801 in Gold Standard (GS)

4.6/ 10
Integrity
4.5
Transparency
4.8
Claim Safety
5.2
Documentation
3.8

Audit Analysis

This Gold Standard improved-cookstove project in Rwanda has a functioning MRV cycle with a named VVB and no reversal events, but is burdened by an unusually large set of material findings and corrective actions (over 30 items) that point to persistent weaknesses in data quality, fNRB calculation, and document consistency. The project-specific baseline, 0% leakage deduction, and absence of a stated buffer pool leave moderate integrity and claim-safety risks. Overall the project is operational but its documentation and verification record show recurring quality issues that limit confidence in the reported emission reductions.

Red Flags

  • Over 30 corrective actions required in the 2026 verification report, spanning fNRB calculation errors, inconsistent stove IDs, survey methodology gaps, and missing evidence — indicating systemic MRV weaknesses
  • fNRB value revised at least three times across documents (0.77 in the PDD, 0.98 in an earlier verification, 0.89 in the 2026 VR), and the method shifted from national default to local field, raising questions about baseline robustness
  • Leakage treatment contradicts itself: the 2024 verification report described leakage as 'quantified' while the 2026 report states it is 'deemed negligible' with a 0% deduction, with no clear justification for the change
  • Crediting period start dates on the Gold Standard Registry differ from the actual verified start dates, as flagged in the material findings

Credit Vintages

IssuedRetiredAvailable
2022
8,5268,5260
2023
9,9135,0884,825
2024
10,000010,000
Total28,43913,61414,825

Risk Indicators

Additionality

Combined test applied but VVB confirmation not explicitly stated

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification contradicts earlier report

Baseline

Project-specific baseline, fNRB revised multiple times

Safeguards

Grievance mechanism and benefit sharing present but FPIC not confirmed

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents