Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS5047 VPA85 African Improved Cookstoves and Clean Water Programme: Gishwati – Mukura Forest Conservation Project XIII

GS-2980 ↗ · current registry ID: GS11021

#1116of 1329 in Industrial#109of 139 in Rwanda#1567of 1801 in Gold Standard (GS)

4.1/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
4.5
Documentation
3.5

Audit Analysis

This Gold Standard cookstove project in Rwanda presents a combined additionality test and a project-specific baseline, but critical verification elements are missing: no VVB name, no verified ERR figure, no buffer pool percentage, and no monitoring period are stated in the available record. Three contradictions between the PDD and monitoring report (leakage justification, FNRB value, grievance mechanism) introduce data-reliability concerns that temper confidence in the project's claims.

Red Flags

  • No VVB name or verification confirmation found in any available document — additionality test type is listed as 'combined' but independent verification is unconfirmed
  • Leakage deduction is 0% yet the monitoring report claims it was 'quantified' while the PDD (2018) states it was 'deemed negligible' — a 0% deduction is inconsistent with a quantified assessment
  • No verified ERR figure is available to validate the 5,850 tCO₂e claimed, and no lifetime ex-ante estimate is stated, making over- or under-crediting impossible to assess
  • Extraction record contains significant data-quality errors (project name listed as VPA90 vs actual VPA85; registry listed as CDM vs actual Gold Standard; technical specs describe Word document format rather than project parameters)

Credit Vintages

IssuedRetiredAvailable
2023
6,09406,094
2024
10,000010,000
Total16,094016,094

Risk Indicators

Additionality

Combined test documented but VVB confirmation not found

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction with contradictory justifications (quantified vs negligible)

Baseline

Project-specific baseline; no reassessment date stated

Safeguards

Grievance mechanism and benefit sharing confirmed; FPIC not stated

Double-claim

CORSIA and CCP statuses both unstated; dual-channel risk unassessed

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents