Skip to main content
GSEnergy Efficiency - DomesticMozambiqueAMS-II.G

GS5562 VPA 2: Efficient and Clean Cooking for Mozambican Low-Income Households

GS-2669 ↗ · current registry ID: GS10711

#1117of 1329 in Industrial#39of 51 in Mozambique#1568of 1801 in Gold Standard (GS)#168of 189 in AMS-II.G

4.1/ 10
Integrity
4.0
Transparency
5.0
Claim Safety
3.5
Documentation
4.0

Audit Analysis

This Gold Standard clean-cooking project in Mozambique has the basic structural elements (combined additionality test, quantified 5% leakage deduction, named VVB) but is undermined by extensive compliance findings, a project-specific baseline with no reassessment record, absence of FPIC for a low-income household project, and a fundamental mismatch between the monitoring period (2021–2023) and the crediting period (2023–2028). The verified ERRs represent only about 3% of the pro-rata lifetime expectation, and multiple contradictions across documents raise data-reliability concerns.

Red Flags

  • Monitoring period (Feb 2021 – Mar 2023) largely precedes the crediting period (Feb 2023 – Feb 2028); only ~1.5 months of overlap, raising structural over-crediting risk
  • FPIC was not conducted despite the project targeting low-income Mozambican households
  • Extensive material findings include GS compliance violations, rejection of retroactive crediting, loss of ERRs (Mar 2019 – Apr 2021), and multiple unresolved CARs
  • Verified ERRs (70,285) represent only ~3% of the pro-rata lifetime expectation (~2.2 million tCO₂e) for the elapsed monitoring period

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test present; VVB confirmation contradictory across documents

Permanence

no reversal events reported

Leakage

5% quantified deduction with justification

Baseline

Project-specific baseline; no reassessment date found

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04AMS-II.G

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents