Skip to main content
GSEnergy Efficiency - DomesticEthiopiaGeneral Methodologyv2.1

GS5658 VPA 30: Improved Cookstoves for Environmental Conservation in Southern Ethiopia

GS-2830 ↗ · current registry ID: GS10873

#1314of 1329 in Industrial#36of 36 in Ethiopia#1786of 1801 in Gold Standard (GS)

2.6/ 10
Integrity
2.5
Transparency
2.5
Claim Safety
2.5
Documentation
3.0

Audit Analysis

This Gold Standard cookstove VPA in southern Ethiopia presents severe data-integrity and verification concerns. The most recent verification report (April 2025) explicitly states that additionality was NOT confirmed by the VVB, 19 material findings and over 30 corrective actions were raised, and the claimed versus verified emission-reduction figures are irreconcilable across documents. While the project type (domestic cookstove efficiency) carries inherently lower permanence risk, the volume and severity of unresolved issues make the credit claims unreliable in their current state.

Red Flags

  • Additionality was NOT verified by the VVB in the April 2025 verification report, reversing the 2023 finding; no additionality test type is stated in any available document
  • Claimed ERR (20,008 tCO2e) and verified ERR (6,870 tCO2e) are irreconcilable across the monitoring and verification reports, with values appearing swapped between documents
  • 19 material findings and 30+ corrective actions remain open, including inconsistent stove counts, missing CIGM reporting, unrepresentative usage-survey sampling, and implausible 100% usage/technology-day claims
  • FPIC was not conducted despite the project distributing cookstoves to rural households in southern Ethiopia
  • No buffer pool percentage is stated in any available document, leaving reversal risk unaddressed

Credit Vintages

IssuedRetiredAvailable
2020
5,3345,3340
2021
10,76510,7650
2022
9,5828,867715
2023
6,15506,155
Total31,83624,9666,870

Risk Indicators

Additionality

Not verified by VVB; no test type stated

Permanence

low inherent reversal risk (cookstove)

Leakage

5% quantified deduction (2025 VR)

Baseline

Project-specific; no reassessment date found

Safeguards

CIGM present but reporting incomplete; FPIC not conducted

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents