Skip to main content
GSEnergy Efficiency - DomesticMadagascarGeneral Methodologyv2.1

GS5658 VPA 7: Water is Life, Madagascar

GS-1513 ↗ · current registry ID: GS6752

#628of 1329 in Industrial#7of 26 in Madagascar#955of 1801 in Gold Standard (GS)

4.9/ 10
Integrity
5.0
Transparency
5.0
Claim Safety
4.5
Documentation
5.0

Audit Analysis

This Gold Standard energy-efficiency project in Madagascar (displacing decentralized thermal energy) has VVB-confirmed additionality and a named verification body, but is undermined by 14 material findings (9 CARs, 5 CLs), the absence of a buffer pool, unaddressed reversal risk, and six cross-document contradictions including a usage-rate jump from 0.75 to 0.95 and a claimed ERR that exceeds the ex-ante lifetime estimate. The lack of a verified ERR figure and the project-specific baseline further limit confidence in the credit claims.

Red Flags

  • 14 material findings (9 CARs + 5 CLs) reported in the verification report, indicating significant compliance or MRV issues during the monitoring period
  • No buffer pool percentage stated and reversal events explicitly 'not addressed' — permanence risk is unmitigated
  • Total ERR claimed (50,617 tCO2e) exceeds the ex-ante lifetime estimate (48,232 tCO2e) by ~5%, and a second monitoring report cites a figure of 652,680 tCO2e, a 13.5× discrepancy
  • Usage rate assumption increased from 0.75 in the PDD (2019) to 0.95 in the 2023 monitoring report without clear justification for the 20-percentage-point jump
  • Crediting period differs between the PDD (2016–2036, 20 years) and the 2023 monitoring report (2018–2025, ~7 years), creating ambiguity about the actual crediting window

Credit Vintages

IssuedRetiredAvailable
2018
1,5211,5210
2019
8,7936,7932,000
2020
2,6272,6270
2021
2,3352,3350
2022
1,9631,9630
2023
1,7391,7390
Total18,97816,9782,000

Risk Indicators

Additionality

VVB-confirmed (SustainCERT)

Permanence

reversals not addressed

Leakage

0% deduction, 'negligible' but contradicted by earlier 'quantified' basis

Baseline

Project-specific; reassessment date not stated

Safeguards

FPIC conducted; grievance mechanism confirmed (2023)

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents