Skip to main content
GSEnergy Efficiency - DomesticMozambiqueGeneral Methodologyv2.1

GS7591 VPA 22 Central Mozambique Safe Water Programme

GS-2336 ↗ · current registry ID: GS7642

#631of 1329 in Industrial#17of 51 in Mozambique#958of 1801 in Gold Standard (GS)

4.9/ 10
Integrity
5.0
Transparency
5.2
Claim Safety
4.8
Documentation
4.5

Audit Analysis

The Central Mozambique Safe Water Programme is a Gold Standard avoidance project displacing thermal energy for water heating, with confirmed additionality and a recent baseline reassessment. However, a significant over-issuance of 30,370 tCO2e in the first monitoring period, ongoing non-compliance with methodology monitoring requirements, and numerous data-quality corrections across borehole counts, SDG calculations, and ER/MR consistency substantially undermine confidence in the project's integrity and claim safety.

Red Flags

  • Over-issuance of 30,370 tCO2e in MP1 due to incorrect calculation of borehole operating days; deducted in the current period but indicates weak internal QA
  • Project in non-compliance with methodology requirement SDWS 23 (monitored quantity of safe water); deviation requests not approved and issuance suspended for non-compliant periods
  • Leakage deduction reduced from 5% in the PDD to 0% in the 2026 verification report with only a 'deemed negligible' justification, despite the project-specific baseline
  • Additionality was not confirmed by the VVB at validation (2024) but was confirmed at verification (2025), raising questions about the robustness of the additionality case at design stage
  • 26 corrective action requests and 13 clarifications raised across verification cycles, including double-counting of a borehole, inconsistent borehole counts (2,038 vs 1,936), and incorrect SDG net-benefit calculations

Credit Vintages

IssuedRetiredAvailable
2020
7,8683,3534,515
2021
49,50033,52615,974
2022
53,4482,51650,932
2023
59,83258,6371,195
2024
60,00058,8001,200
2025
5,7535,638115
Total236,401162,47073,931

Risk Indicators

Additionality

VVB-confirmed but contradicted at validation

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, reduced from 5% in PDD, deemed negligible

Baseline

Project-specific, reassessed 2024, not jurisdictional

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents