Gunung Megang Add-on Combined Cycle Project
#30of 33 in Indonesia#1422of 1459 in CDM (UNFCCC)#8of 8 in ACM0007
Audit Analysis
The Gunung Megang Add-on Combined Cycle Project is a CDM-era EE supply-side project with a VVB-confirmed investment additionality test and quantified leakage, but suffers from a critical 10× discrepancy in claimed emissions reductions between the PDD and validation report, an absence of any monitoring-period data, and a project-specific baseline with no reassessment record. The low extraction confidence and reliance solely on 2013 validation-stage documents limit the ability to verify ongoing performance.
Red Flags
- 10× discrepancy in total ERR between the PDD (106,172 tCO₂e) and the validation report (1,061,720 tCO₂e) — a material data-reliability issue that undermines confidence in the claimed reduction volume
- No monitoring-period data, verified ERR, or usage-rate verification found in any available document, making it impossible to confirm actual delivery against the ex-ante estimate
- Low extraction confidence across the document set, indicating at least one key document was poorly readable or incomplete
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
no monitoring record
Quantified but no specific deduction stated
Project-specific; no reassessment record
Safeguards and benefit-sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →