GSBiogas - ElectricityTurkeyGeneral Methodologyv2.1

Halilbeyli Biogas Plant

GS-2581 ↗ · current registry ID: GS7736

#29of 268 in Biogas#126of 295 in Turkey#323of 1801 in Gold Standard (GS)

5.6/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
5.5
Documentation
5.5

Audit Analysis

The Halilbeyli Biogas Plant is a Gold Standard biogas-to-electricity project in Turkey with a VVB-verified combined additionality test and no reported reversal events, but it carries notable gaps: no buffer pool is documented, FPIC was not conducted, the baseline is project-specific and modeled, and seven material findings triggered five corrective actions. The project delivered roughly 110% of its pro-rata ex-ante expectation for the 2024 monitoring period, which is reassuring, yet several key parameters (FNRB, usage rates, CORSIA/CCP status) remain unstated in the available record.

Red Flags

  • Free, Prior and Informed Consent (FPIC) was not conducted, despite the project involving local communities and manure/waste feedstock.
  • Seven material findings were raised in the verification report, including the fourth gas engine not yet being commissioned, outdated TEIAS emission-factor links, and initially missing stakeholder consultation and grievance-mechanism evidence.
  • The crediting period is stated differently in the verification report (2020-10-25 to 2025-10-24) versus the monitoring report (2022-05-09 to 2024-04-30), creating ambiguity about the true project duration and the basis for pro-rata calculations.

Credit Vintages

IssuedRetiredAvailable
2022
47,511047,511
2023
65,351065,351
2024
23,185023,185
Total136,0470136,047

Risk Indicators

Additionality

VVB-verified combined test

Permanence

no reversals

Leakage

0% deduction, 'quantified' justification only

Baseline

Project-specific, modeled; reassessment timing not stated

Safeguards

Grievance & benefit sharing present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents