#38of 189 in Methane#384of 1084 in China#552of 1459 in CDM (UNFCCC)#1of 6 in AM0025
Audit Analysis
A CDM municipal solid waste incineration project in Haining, China, validated by SGS United Kingdom with a combined additionality test confirmed by the VVB. The project carries moderate integrity concerns due to a project-specific baseline, 11 closed corrective action requests, and the absence of a verified ERR figure to benchmark against the 515,590 tCO₂e lifetime claim. Documentation is reasonably complete across 14 sources with high extraction confidence, but several key monitoring and verification fields remain unreported.
Red Flags
- 11 Corrective Action Requests were raised during validation and subsequently closed, indicating material issues in the original project design that required expert-driven revision
- Total verified ERR is not stated in any available document, making it impossible to confirm whether the 515,590 tCO₂e lifetime claim is supported by actual monitoring data
- Crediting period is inconsistent between the validation report (2010-01-01 to 2016-12-31) and the monitoring report (2011-07-01 to 2018-06-01), creating ambiguity about the actual project duration
- Leakage is described as quantified in the monitoring report, but the specific deduction percentage is not stated in any extracted document
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 54,235 | 0 | 54,235 | |
| Total | 54,235 | 0 | 54,235 |
Risk Indicators
Combined test, VVB-confirmed
No reversal data; CDM-era project
Quantified but pct unstated
Project-specific, no reassessment date
Mentioned but no FPIC or grievance mechanism
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →