Hebbakavadi Canal Based Mini Hydro Project in Karnataka, India
#1459of 1935 in Renewable energy#802of 975 in India#1207of 1459 in CDM (UNFCCC)
Audit Analysis
A small-scale canal-based mini hydro project in Karnataka with VVB-confirmed additionality, but undermined by seven material findings, twelve corrective actions, and five cross-document contradictions covering baseline method, leakage treatment, safeguards, and benefit-sharing. The 0% leakage deduction and absence of FPIC or a grievance mechanism further weaken the integrity profile, while the three-fold discrepancy in reported ERR figures between the 2007 and 2009 monitoring reports raises transparency concerns.
Red Flags
- Five contradictions between the 2007 validation report/PDD and the 2009 monitoring report on baseline method, leakage justification, safeguards, benefit-sharing, and ERR figures
- Seven material findings and twelve corrective actions identified during validation, including missing host-country approval, expired methodology version, and inadequate additionality arguments
- 0% leakage deduction with contradictory justification ('quantified' in 2009 MR vs 'deemed negligible' in 2007 validation report) for a canal-diversion hydro project where downstream water-use impacts are plausible
- No FPIC conducted, no grievance mechanism in place, and safeguards not mentioned in the 2009 monitoring report
- ERR of 3,138 tCO₂ (2009 MR) versus 11,789.7 tCO₂ (2007 MR) — a 3.7× difference that cannot be fully reconciled without knowing the exact monitoring-period boundaries of the 2007 report
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 11,768 | 0 | 11,768 | |
| 2008 | 3,425 | 0 | 3,425 | |
| 2011 | 3,138 | 0 | 3,138 | |
| Total | 18,331 | 0 | 18,331 |
Risk Indicators
VVB-confirmed combined test
low inherent risk for hydro
0% deduction, contradictory justification
Method contradicts across documents; 2006 grid EF
No FPIC, no grievance mechanism, not in 2009 MR
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →