Hebei Handan Damingchang Biogas Recovery and Utilization Project
#60of 268 in Biogas#514of 1084 in China#598of 1339 in Verra (VCS)#20of 105 in AMS-III.D
Audit Analysis
A VCS-registered biogas recovery project in China using the well-established AMS-III.D methodology, with VVB-confirmed additionality and a grievance mechanism in place. However, the project-specific modeled baseline, absence of a stated buffer pool, two inter-document contradictions, and several missing monitoring parameters (carbon content, usage rate, end-use tracking) limit confidence in the credit's robustness. The material findings are minor documentation issues, but the overall evidence base is incomplete.
Red Flags
- Contradiction between the validation report (regulatory additionality test) and the PDD (barrier test) — the two documents describe different additionality pathways
- Carbon content of biogas, usage rate (assumed and verified), and end-use tracking are all absent from the extracted record
- Original survey questionnaires from local residents were not included in the evidence documentation (material finding)
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed regulatory test
biogas reversal risk low but unquantified
0% deduction, deemed negligible; justification thin
Project-specific modeled baseline; no reassessment date
FPIC conducted, grievance mechanism present
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →