Hebei Huafeng Coking Gas Recovery for Power Generation Project
#879of 1084 in China#1170of 1459 in CDM (UNFCCC)#14of 28 in ACM0012
Audit Analysis
A CDM energy-efficiency project recovering coking gas for power generation, validated by Bureau Veritas with a combined additionality test. However, the project relies on a project-specific baseline with a 2008 grid emission factor, applies a 0% leakage deduction with only a 'deemed negligible' justification, and the available record contains no monitoring data, no verified emission reductions, and a low extraction confidence rating. Multiple contradictions between the PDD and validation report, along with nine corrective actions required at validation, indicate meaningful data reliability concerns.
Red Flags
- Grid emission factor of 0.9928 tCO2/MWh is from 2008 and was flagged in corrective actions for being outdated; no updated value is confirmed in the available record
- Leakage deduction of 0% justified only as 'deemed negligible' for a coking gas recovery project where displaced gas could be combusted elsewhere
- No monitoring reports or verified emission reduction figures found in the extracted record, making it impossible to confirm actual delivery against the 1,581,534 tCO2e lifetime claim
- Crediting period contradicts between the PDD (2012-07-01 to 2022-04-30) and the validation report (2009-01-01 to 2018-11-01), creating uncertainty about the actual project duration and total credit volume
- Nine corrective actions were required at validation, including revisions to the financial benchmark, VAT calculation, sensitivity analysis, and monitoring parameters, indicating the initial PDD had material weaknesses
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, weak justification
Project-specific, 2008 grid EF
Mentioned but not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →