Skip to main content
CDMLandfill gasChinaAM0025

Hebei Lingda Municipal Solid Waste Incineration Project

CDM-6134 ↗

#85of 189 in Methane#748of 1084 in China#987of 1459 in CDM (UNFCCC)#3of 6 in AM0025

4.8/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
4.5
Documentation
5.0

Audit Analysis

A CDM municipal solid waste incineration project in China with a VVB-confirmed combined additionality test and a quantified leakage treatment, but significant gaps in monitoring data, permanence safeguards (no buffer pool), and independent verification of actual emission reductions. The identical claimed and verified ERR figures, combined with the absence of any monitoring reports in the evidence set, raise questions about whether actual performance has been independently verified.

Red Flags

  • Total ERR claimed and verified are identical (1,019,914 tCO2e), and no monitoring period or monitoring reports appear in the evidence set, suggesting the 'verified' figure may simply be the ex-ante estimate rather than an independently verified actual
  • Leakage is described as 'quantified' in the justification but the actual deduction percentage is not stated in any available document
  • Material finding: the EFN2O value in the PDD was initially incorrect (not the IPCC default) and required correction, indicating a quality-control gap in the original submission

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

Quantified but % not stated

Baseline

Project-specific, modeled

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CCP/CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31AM0025

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents