Hebei Shengyuan Xuandong Coal Mine Methane Utilization Project
#77of 189 in Methane#688of 1084 in China#902of 1459 in CDM (UNFCCC)#12of 35 in ACM0008
Audit Analysis
A CDM coal mine methane utilization project with a solid VVB-confirmed investment additionality test and legally mandated capture, but undermined by a project-specific modeled baseline, contradictory leakage justifications across documents, and a significant under-delivery of roughly 37% of the pro-rata ex-ante expectation for the monitored period. The absence of FNRB, usage-rate, and buffer-pool data limits confidence in the credit quantity.
Red Flags
- Verified emissions reductions (179,526 tCO2) represent only ~37% of the pro-rata ex-ante expectation (~480,000 tCO2) for the 14-month monitoring period, suggesting the PDD baseline may have been overly optimistic
- Leakage justification is contradictory: the validation report (2011) states 'deemed negligible' while the monitoring report (2014) states 'quantified', yet both apply a 0% deduction
- FNRB value, usage monitoring method, and usage rate are all absent from the extracted record, leaving the energy-replacement assumption unverifiable
- Grid emission factor is from 2007 and has not been updated in the available documents
- Gas capture legally mandated — additionality in doubt
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 263,372 | 0 | 263,372 | |
| Total | 263,372 | 0 | 263,372 |
Risk Indicators
VVB-confirmed investment test; capture legally required
no reversal events but no permanence s
0% deduction with contradictory justifications across docume
Project-specific modeled baseline; no reassessment data
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →