Hefei City Municipal Solid Waste Incineration Power Generation Project
#101of 189 in Methane#798of 1084 in China#1046of 1459 in CDM (UNFCCC)#4of 6 in AM0025
Audit Analysis
A CDM waste-incineration project (AM0025 v13) validated by SGS in 2013 with a combined additionality test confirmed by the VVB, but the record is thin on monitoring data, fnrb methodology, and post-validation performance. Eleven corrective action requests during validation (all closed) and a low extraction confidence level temper confidence in the underlying documentation. The project's crediting period ended in January 2023, and no monitoring-period results are available in the extracted record.
Red Flags
- Eleven corrective action requests (CARs) were raised and closed during validation, including inconsistent geographic coordinates, missing IRR cash-flow items, and absent monitoring parameters in the PDD — indicating a materially flawed initial submission
- No monitoring-period data, fnrb methodology, or usage-rate verification is present in the extracted record, making it impossible to confirm that actual performance matched the ex-ante estimate of 1,965,025 tCO₂e
- Minimum extraction confidence is rated low, and one evidence document is listed as 'unknown', reducing reliability of the structured data
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
Quantified but no specific % given
Project-specific, no reassessment data
Mentioned but no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →