Henan Grouped Biogas Recovery and Utilization Project
#47of 268 in Biogas#453of 1084 in China#529of 1339 in Verra (VCS)#16of 105 in AMS-III.D
Audit Analysis
A VCS biogas project in China with VVB-confirmed additionality and no reported reversal events, but undermined by two material findings in baseline parameters (Np,y and Wsite inconsistencies), eight corrective actions, a project-specific modeled baseline, and contradictory documentation on FPIC and leakage justification. The project delivered exactly what it claimed for the 18-month monitoring period, but the absence of a lifetime ex-ante figure, buffer pool details, and end-use tracking limits confidence in long-term claim integrity.
Red Flags
- Two material findings in the verification report: inconsistent Np,y values for marketing swine between the PDD table and spreadsheet, and inconsistent Wsite parameter application across Pingyu and Shangcai farms — both directly affect baseline emission calculations
- Eight corrective actions required by the VVB, including justifying Wsite values against IPCC defaults and explaining sample size methodology, indicating unresolved data-quality concerns in the baseline
- Contradiction between the verification report (FPIC conducted: yes) and the monitoring report (FPIC conducted: no), both dated 2025-03-17, creating uncertainty about free, prior, and informed consent
- Leakage justification is inconsistent: the verification report states 'quantified' while the monitoring report states 'deemed negligible', yet both result in a 0% deduction with no quantified leakage figure provided
- No buffer pool percentage, permanence claim duration, or reversal-risk mitigation mechanism is documented in the available record
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 1,098 | 1,098 | 0 | |
| Total | 1,098 | 1,098 | 0 |
Risk Indicators
VVB-confirmed, no legal capture requirement
mixed evidence / unresolved risk
0% deduction, contradictory justification, no quantified figure
Project-specific modeled baseline with material findings
FPIC contradiction, grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →