Henan Mengjin CMM Power Generation Project
#52of 189 in Methane#522of 1084 in China#599of 1339 in Verra (VCS)#6of 35 in ACM0008
Audit Analysis
A coal-mine-methane power generation project in Henan, China, verified by TÜV NORD CERT under the established ACM0008 methodology. Additionality is VVB-confirmed via an investment test and capture is legally required, which are strong positives. However, a significant discrepancy between the PDD and monitoring report on the ERR figure, a project-specific (modeled) baseline, and several data gaps (buffer pool, CORSIA/CCP status) temper the overall assessment.
Red Flags
- ERR figure discrepancy: the PDD reports 91,322 tCO₂ while the monitoring report reports 1,288,859 tCO₂ for the same field, creating material uncertainty about the ex-ante estimate versus the verified period figure
- Baseline is project-specific and modeled rather than jurisdictional or measured, increasing sensitivity to assumption choices
- Five contradictions across documents (ERR, additionality test type, FPIC, leakage justification, baseline type) indicate data-reliability concerns
- Gas capture legally mandated — additionality in doubt
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test; capture legally required
mixed evidence / unresolved risk
0% deduction with quantified justification; reasonable for CMM-to-power
Project-specific and modeled; not jurisdictional
FPIC conducted (validation report); grievance mechanism present
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →