Skip to main content
CDMEE own generationChinaACM0012

Henan Nanyang Zhenping Cement Waste Heat Recovery and Utilization for Power Generation Project

CDM-2095 ↗

#462of 1329 in Industrial#575of 1084 in China#772of 1459 in CDM (UNFCCC)#10of 28 in ACM0012

5.1/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
5.5

Audit Analysis

A CDM waste-heat-recovery project in the cement sector with a VVB-confirmed investment additionality test, but hampered by seven material findings, nine corrective actions, a project-specific baseline, and no buffer pool. The first monitoring period delivered roughly 74% of the pro-rata ex-ante expectation, and several key transparency fields (verified ERR, FN/RB method, CORSIA/CCP status) remain unreported. Overall a moderate-quality project with meaningful data gaps and under-delivery in its first monitoring window.

Red Flags

  • Seven material findings and nine corrective actions were raised during validation, covering methodology application, baseline determination, investment analysis transparency, and emission-factor calculation errors
  • No buffer pool is in place to protect against reversal or project failure over the 10-year crediting period
  • The first monitoring period (≈8 months) delivered only ~74% of the pro-rata ex-ante expectation (47,107 vs ~63,700 tCO₂e), signalling potential over-crediting in the ex-ante estimate
  • Contradiction between the validation report (leakage 'deemed negligible') and the monitoring report (leakage 'quantified') while the actual deduction is 0%
  • Verified ERR figure is not stated in the extracted record, preventing independent cross-check of the claimed 47,107 tCO₂e

Credit Vintages

IssuedRetiredAvailable
2011
46,920046,920
Total46,920046,920

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

EE project with lower reversal risk

Leakage

0% deduction; justification contradicts between docs

Baseline

Project-specific; no reassessment date stated

Safeguards

Mentioned and benefit sharing described; FPIC and grievance

Double-claim

CORSIA and CCP status not stated; CDM Phase 1 credits potent

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0012

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents