Hengyang Peike Animal Manure Composting Project
#73of 1329 in Industrial#154of 1084 in China#190of 1339 in Verra (VCS)#6of 105 in AMS-III.D
Audit Analysis
The Hengyang Peike Animal Manure Composting Project is a VCS-registered waste-handling project with a verified investment-test additionality and a project-specific baseline. The first monitoring period delivered roughly 94% of the pro-rata ex-ante expectation, indicating no material over-crediting. However, a 0% leakage deduction supported by contradictory justifications across documents, the absence of a stated buffer pool, and eleven material findings (all corrected) temper confidence in the project's robustness.
Red Flags
- Leakage deduction is 0% yet the monitoring report describes the justification as 'quantified' while the validation report calls it 'deemed negligible' — the two documents disagree on the basis of the zero deduction.
- Eleven material findings were raised during validation/verification, including an initially missing IRR sheet, an incorrect GWP source (AR6 instead of AR5), and duck manure being included in claims without a farm agreement; all were corrected but the volume signals weak initial documentation.
- No buffer pool percentage is stated in any available document, leaving the permanence safeguard unquantified even though the project type carries low reversal risk.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 57,433 | 0 | 57,433 | |
| Total | 57,433 | 0 | 57,433 |
Risk Indicators
Investment test, VVB-verified
Waste project, no reversal risk
0% deduction, contradictory justification
Project-specific, not yet due for reassessment
Grievance mechanism present, FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →