Vai al contenuto principale
VCS Forestry China Registry: On Hold - see notification letter Documentazione completa General Methodology v2.0

Hubei Hongshan IFM (Conversion Of Logged To Protected Forest) Project

VCS-1935 ↗

6.7 / 10
Integrity
6.5
Transparency
7.5
Claim Safety
6.0
Documentation
6.8

Score Breakdown

Integrity

verified Buffer pool of 22% and no reversal events reported in the monitoring report (monitoring_report, 2023-11-08)

missing Multiple contradictions on additionality, safeguards and leakage across validation, PDD and the monitoring report indicating reliability concerns

Transparency

verified Monitoring period and verified vs claimed removals stated; VVB named as China Testing and Certification International Group (monitoring_report, 2023-11-08)

inferred Unavailable grid emission factor and some project parameters not stated in extracted records (not found in available documents)

Claim Safety

verified Not CORSIA-eligible (CORSIA false) and methodology VM0010 stated (monitoring_report, 2023-11-08)

missing Leakage treated as negligible with a 0% deduction but documentation shows contradictory treatment and justification (monitoring_report vs other docs)

Documentation

verified Recent monitoring report (2023-11-08), validation report and PDD are in the evidence set; 28 documents used and high extraction confidence

missing Corrective action CAR 01 remains listed and several key items are inconsistent across documents, reducing documentary reliability

Detailed Analysis

Integrity

The monitoring report (2023) shows no reversal events and a 22% buffer pool, and the VVB confirmed additionality in the latest report — positive signs for permanence and additionality. However, additionality is contradicted by an earlier document that did not confirm it, and the project uses a project-specific baseline (VM0010) with no recorded reassessment date, which weakens baseline robustness. A listed corrective action (CAR 01) also indicates some outstanding issues. Taken together these raise moderate concern and lower the integrity score.

Transparency

Transparency is relatively strong: the monitoring report provides the monitoring period (2019-07-01 to 2023-09-30), the VVB is named, and total ERs claimed equal total ERs verified (1,195,059). The project registry is VCS and evidence includes PDD, validation report, monitoring report and issuance. Missing items (grid emission factor, some usage-rate fields) are not found in the extracted record, but extraction confidence is high and many documents were used, supporting a good transparency rating.

Claim Safety

Claim risk is moderate. The project is not CORSIA-eligible and there is no evidence of CCP approval, which reduces double-claim risk. However, leakage is set to negligible with a 0% deduction in the monitoring report while other documents either do not address leakage or contradict that treatment, creating over-crediting risk. Usage rates and some parameters are not reported, limiting the ability to judge conservative assumptions.

Documentation

Documentation is recent and multiple core documents are present (validation report, PDD, monitoring report, issuance) with high extraction confidence and 28 documents used. Nevertheless, several contradictions across documents (see merged_facts.contradictions) and a corrective action lower the documentation score: the validation report (2019) states no safeguards/FPIC/grievance while the monitoring report (2023) states these were implemented. The presence of CAR 01 also reduces confidence in completeness.

Overall

I privileged the most recent monitoring report (monitoring_report, 2023-11-08) where conflicts exist because it is later and reports verification results; thus I accepted values reported there (e.g., VVB confirmation of additionality, safeguards present, FPIC conducted, leakage deemed negligible). I flagged the older validation report (2019) and PDD where they conflict. Because these contradictions indicate inconsistent documentation and potential reliability problems, scores were adjusted downward (especially integrity and documentation). If the validation/PDD evidence were resolved or corrective actions closed with clear reconciled documentation, scores would be higher.

Audit Analysis

The project shows moderate integrity and good transparency: a recent monitoring report (2023) confirms verified removals equal to claimed removals and a VVB attested additionality. However, multiple contradictions between validation, PDD and the latest monitoring report (notably on additionality, safeguards, FPIC and leakage) reduce confidence and suggest some data reliability issues.

Project Description

Zhejiang Zhongzheng Forestry Development Co.,Ltd implemented the Hubei Hongshan IFM Project in Hongshan County, Suizhou City, Hubei Province of China. The project covers an area of 302,800ha and focuses on Improved Forest Management (IFM) of forests converted from logged to protected areas.

Red Flags

  • Contradictory statements across documents about whether additionality was VVB-confirmed
  • Contradictions on safeguards, FPIC and grievance mechanism between validation (2019) and monitoring (2023)

Credit Vintages

Issued Retired Available
2015
207,121 144,394 62,727
2016
207,026 35,010 172,016
2017
207,298 66,883 140,415
2018
207,052 197,235 9,817
2019
103,647 103,647 0
Total 932,144 547,169 384,975

Cosa migliorerebbe questo punteggio

  • Resolve and publish reconciliation between validation (2019) and the 2023 monitoring report on additionality, safeguards, FPIC and grievance mechanism, and close CAR 01 with documented evidence.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB confirmation in latest report but earlier docs contradic

Permanence

buffer pool present; no reversals reported

Leakage

0% leakage deduction stated but justification inconsistent a

Baseline

project-specific baseline; no reassessment date provided

Safeguards

safeguards and FPIC claimed in 2023 but validation earlier s

Double-claim

not CORSIA-eligible and no CCP evidence

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-23 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti