Skip to main content
GSEnergy Efficiency - DomesticBurundiGeneral Methodologyv2.1

Improved biomass cookstoves for returnees in Burundi

GS-3095 ↗ · current registry ID: GS11140

#788of 1329 in Industrial#4of 5 in Burundi#1176of 1801 in Gold Standard (GS)

4.7/ 10
Integrity
4.8
Transparency
4.5
Claim Safety
5.2
Documentation
3.8

Audit Analysis

A Gold Standard biomass cookstove project in Burundi with VVB-confirmed additionality and no material findings, but undermined by 28 corrective actions flagging widespread parameter inconsistencies, a contradictory FPIC record, a 0% leakage deduction with conflicting justifications across documents, and the absence of a buffer pool or feedstock sustainability assessment. The verified emissions reductions are broadly consistent with the pro-rata ex-ante expectation, but the volume of data-quality issues and unresolved contradictions limit confidence in the underlying calculations.

Red Flags

  • 28 corrective actions in the December 2025 verification report flag inconsistencies in household counts, SDG values, NCV fuel values, ex-ante emission factors, and monitoring parameters between the MR, ER sheet, and PDD
  • FPIC status is contradictory: the PDD (Oct 2022) states FPIC was conducted, while the validation report (Oct 2022) records it as not conducted
  • Leakage justification is inconsistent: the verification report (Dec 2025) describes it as 'quantified' while the monitoring report (Dec 2025) describes it as 'deemed negligible', yet the deduction is 0%
  • No buffer pool is in place and no permanence claim period is stated, leaving reversal risk unmitigated for a cookstove project where stoves can be abandoned or replaced
  • Feedstock sustainability and carbon content testing are not documented, which is a material gap for a biomass-based project

Credit Vintages

IssuedRetiredAvailable
2020
15,55812,5163,042
2021
143,226108,30234,924
2022
378,335189,639188,696
2023
613,671307,140306,531
2024
683,1249,313673,811
2025
351,1900351,190
Total2,185,104626,9101,558,194

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, reassessed 2024

Safeguards

Grievance mechanism present, FPIC contradictory

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents