Skip to main content
VCSAgriculture Forestry and Other Land UseMalaysia Registry: RegisteredVM0005

INFAPRO Rehabilitation of logged-over dipterocarp forest in Sabah, Malaysia

VCS-672 ↗

#18of 261 in Soil carbon#2of 16 in Malaysia#225of 1339 in Verra (VCS)

5.9/ 10
Integrity
5.5
Transparency
6.5
Claim Safety
6.5
Documentation
5.0

Audit Analysis

A long-running VCS ALM forest rehabilitation project in Sabah with a VVB-confirmed additionality test, a 12% buffer pool, and no reported reversal events. However, the project is undermined by 12 inter-document contradictions—most critically on FPIC status, leakage treatment (10% vs 0%), and the crediting period (30 vs 84 years)—along with two material findings requiring corrective action. The verified ERR for the monitoring period represents roughly 60% of the pro-rata ex-ante expectation, indicating conservative delivery.

Red Flags

  • FPIC status directly contradicts between the 2011 verification report (conducted) and the 2026 verification report (not conducted); the more recent 2026 report is privileged, meaning free, prior and informed consent may not have been obtained.
  • Leakage deduction is 10% in the 2011 verification report but 0% in the 2025 monitoring report, and the 2026 verification report states the justification was 'not addressed'—a material inconsistency in a project type where displacement of logging activity is plausible.
  • Crediting period is stated as 30 years (2007–2036) in the 2026 verification report but 84 years (2007–2091) in the 2011 verification report; the 30-year figure is privileged as more recent, but the discrepancy raises questions about the original project design.
  • Two material findings in the 2026 verification report: 30 sample plots within 30 m of roads were included (deviation from the PDD sampling framework) and the QC mean relative difference of 5.7% exceeded the 5% threshold, with corrective actions still outstanding.

Credit Vintages

IssuedRetiredAvailable
2007
509,540509,5400
2011
26,0005,76520,235
2012
26,0005,76520,235
2013
26,0005,76520,235
2014
26,0005,76520,235
2015
26,0005,76320,237
2016
26,0005,76320,237
2017
26,0005,76220,238
2018
26,0005,76620,234
2019
26,0005,76220,238
2020
26,0005,76320,237
2021
26,0005,76320,237
2022
26,0005,76320,237
2023
26,0005,76320,237
2024
13,0002,87910,121
Total860,540587,347273,193

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

12% buffer pool, no reversals

Leakage

10% vs 0% contradiction, justification unclear

Baseline

Project-specific, reassessed 2025

Safeguards

FPIC contradiction, grievance present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02VM0005

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents