Skip to main content
VCSFugitive emissions from production and consumption of halocarbons and sulphur hexafluorideUnited States Registry: RegisteredGeneral Methodologyv2.1

Infra-Red Automatic Refrigerant Leak Detection Efficiency Project

VCS-440 ↗

#31of 189 in Methane#112of 345 in United States#401of 1339 in Verra (VCS)

5.5/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

A VCS-registered fugitive refrigerant leak-detection project in the United States with a VVB-confirmed barrier additionality test and no inherent permanence risk, but undermined by an unaddressed 0% leakage deduction, 14 material findings, 14 corrective actions, and multiple cross-document contradictions. The project delivered exactly the claimed ERR for its monitoring period, and CORSIA eligibility is explicitly excluded, but the documentation quality and baseline specificity limit confidence in the credit's robustness.

Red Flags

  • Leakage deduction of 0% with no justification stated in the 2024 verification report, while the 2024 monitoring report claims it was 'deemed negligible' — a direct contradiction between the two documents for the same period
  • 14 material findings and 14 corrective actions identified in the 2024 verification report, including inconsistent GHG ERR quantification between the ERR sheet and monitoring report, and use of incorrect GWP values (IPCC AR4 instead of AR2) for the 2014 monitoring period
  • No ex-ante lifetime ERR estimate found in the extracted record, preventing a pro-rata over/under-delivery check against the 104,401 tCO₂e verified for 2015–2020
  • Baseline is project-specific and measured, with no reassessment date stated; the 2024 verification report does not confirm a baseline reassessment was performed

Credit Vintages

IssuedRetiredAvailable
2008
18,93018,9300
2009
28,02628,0260
2010
22,41222,4120
2011
19,24319,2430
2012
9,1349,1340
2013
25,92725,9270
2014
30,51920,51910,000
2015
10,2375,2814,956
2016
26,1013,39722,704
2017
16,292016,292
2018
22,449022,449
2019
21,1402,95918,181
2020
8,18208,182
Total258,592155,828102,764

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justification contradictory

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned but no FPIC or grievance mechanism

Double-claim

CORSIA excluded, CCP not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents