Skip to main content
VCSEnergy demandLao Registry: RegisteredVM0050

Installation of high efficiency wood burning cookstoves in Laos

VCS-2521 ↗

#147of 150 in Cookstoves#10of 10 in Lao#1296of 1339 in Verra (VCS)#11of 11 in VM0050

2.9/ 10
Integrity
3.5
Transparency
3.0
Claim Safety
1.5
Documentation
4.0

Audit Analysis

This VCS cookstove project in Laos has a verified additionality test and no reversal events, but is severely undermined by an excess VCU issuance of 5,281 credits, a Verra denial of a project request, multiple fNRB transparency failures, and a massive discrepancy between claimed and verified emission reductions (the project delivered roughly 5–25% of the pro-rata expectation). Thirteen cross-document contradictions and numerous material findings about missing data further erode confidence in the project's integrity and claim accuracy.

Red Flags

  • 5,281 VCUs were issued in excess of the correct amount; the project proponent compensated through cancellation, but the over-issuance is a clear integrity failure.
  • Verra denied a project request because the VVB failed to respond within 60 days of the review report, indicating a breakdown in the verification chain.
  • The fNRB value (0.93 vs 0.83) is contradicted across two verification reports and flagged as 'not transparent' in material findings, with multiple corrective actions still outstanding.
  • Verified ERR (83,503 or 5,281) is only 0.4%–25% of the claimed ERR (1,474,163) for the monitoring period, indicating a severe over-claiming risk.
  • Thirteen contradictions across documents, including leakage deduction (0% vs 5%), usage rate (0.9455 vs 99.16%), additionality test type (combined vs activity), and crediting period dates.

Credit Vintages

IssuedRetiredAvailable
2022
94,224894,216
2023
77,960077,960
2024
159,3810159,381
2025
39,424039,424
Total370,9898370,981

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction contradicted by earlier 5%

Baseline

Project-specific, reassessed 2025

Safeguards

FPIC and grievance present but contradicted in earlier docs

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02VM0050

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents