Integrated Biomass Energy Conservation Project - Malawi
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the validation report supports a barrier-based additionality case.
missing The project uses a project-specific baseline last reassessed in 2008, and reversal events are not addressed with no buffer pool information found.
Transparency
verified The record includes multiple official documents, a named VVB, and a defined monitoring period from 2012-10-02 to 2013-10-01.
missing Claimed versus verified ER figures are not available, and the monitoring method is disputed between an annual survey and self-reporting.
Claim Safety
verified Leakage was quantified at 5% in the verification report, which is better than an unqualified zero deduction.
missing The project-specific baseline and conflicting leakage treatment across reports increase over-crediting risk.
Documentation
verified Fifteen documents were used, including validation, verification, PDD, and monitoring materials, with medium extraction confidence.
missing One key document was not clearly readable, and some core fields such as buffer pool coverage and reversal detail were not found in the extracted record.
Detailed Analysis
Integrity
The verification report confirms additionality through a barrier test and states that the VVB reviewed the project, which supports the core crediting case. At the same time, the baseline is project-specific and was last reassessed in 2008, while reversal events are marked as not addressed and no buffer pool percentage was found, which weakens permanence confidence. Leakage is treated as quantified in the 2015 verification report, but the earlier verification report described it as negligible, so the integrity score is moderated for inconsistency.
Transparency
The documentation set includes a named verifier, a defined monitoring period, and several official project documents, which helps traceability. However, the record does not provide verified versus claimed emission reduction totals, and the usage monitoring approach is inconsistent between an annual survey in the verification report and self-reporting in the monitoring report. The absence of clear registry completeness details and the medium extraction confidence keep transparency below average.
Claim Safety
Claim safety is weakened by the project-specific baseline and by conflicting leakage treatment across reports, because these issues can affect the risk of over-crediting. The verification report’s 5% leakage deduction is a positive sign, but the earlier report’s negligible-leakage treatment creates uncertainty about which assumption should be trusted. No CORSIA eligibility or CCP approval is stated, so there is no strong external claim-quality signal to offset these concerns.
Documentation
Documentation breadth is reasonably good, with validation, verification, PDD, and monitoring documents all represented and fifteen documents used overall. Still, the extraction confidence is only medium, and at least one key document was poorly readable, which lowers confidence in completeness. Important items such as buffer pool coverage, reversal detail, and verified emission totals were not found in the extracted record.
Overall
Overall, this is a mid-quality project record: it has a credible additionality case and a decent document set, but the evidence is weakened by a project-specific baseline, missing permanence detail, and several contradictions. I privileged the later verification report for leakage and usage monitoring because it is more recent and more directly tied to verification, but the conflicting earlier statements still reduce reliability. The contradiction on benefit sharing was resolved in favor of the monitoring report because it is more specific to implementation, while the additionality test conflict was resolved in favor of the validation report because it is the primary source for additionality assessment.
Audit Analysis
The project has some positive integrity signals, including VVB-confirmed additionality, a stated barrier test, and no reported material findings. However, the record also shows a project-specific baseline, a reversal risk that is not addressed, and contradictions around leakage, usage monitoring, and benefit sharing that reduce confidence in the claims.
Project Description
Developer: Hestian Innovation Type: Energy Efficiency - Domestic Size: Large scale Methodology: GS TPDDTEC v 1. Crediting period: 2008-11-24 → 2015-11-23 Estimated annual credits: 59029 tCO2e SDGs: Goal 3: Good Health and Well-Being, Goal 13: Climate Action, Goal 15: Life On Land
Red Flags
- Leakage treatment is inconsistent across documents, with one verification report using a 5% deduction while an earlier verification report treated leakage as negligible.
- Usage monitoring and benefit-sharing evidence conflict between documents, and reversal risk is not addressed despite no buffer pool information being found.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 9,449 | 9,449 | 0 | |
| 2010 | 27,381 | 27,381 | 0 | |
| 2011 | 80,370 | 80,370 | 0 | |
| 2012 | 76,879 | 76,879 | 0 | |
| 2013 | 62,443 | 61,934 | 509 | |
| Total | 256,522 | 256,013 | 509 |
Cosa migliorerebbe questo punteggio
- Publish a clear reconciliation of the leakage, usage monitoring, and benefit-sharing discrepancies across the validation, monitoring, and verification documents.
- Provide explicit permanence and claim-safety evidence, including buffer pool treatment, reversal monitoring, and verified emission reduction totals.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed barrier test
No buffer pool or reversal detail found
Quantified but inconsistent leakage treatment
Project baseline, reassessment timing old
FPIC, grievance mechanism, and benefit sharing noted
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
Other
validation
- Verification Report_2nd monitoring period_10.02.2010 to 10.01.2011_v1.pdf
- GS Verification Workplan 28.01.2013.pdf
- Verification Report_4th monitoring period_10.02.2012 to 10.01.2013.pdf
- Verification Report_1st monitoring period_24.11.2008 to 10.01.2010.pdf
- Verification Report_3rd monitoring period_10.02.2011 to 10.01.2012.pdf
- GS Validation Report 08.05.2010_v2.1.pdf
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →