Istanbul 3rd Airport Rail System Connection by Republic of Türkiye MoTI

ICR-339 ↗

#47of 75 in TR#96of 154 in Intl. Carbon Registry (ICR)#3of 5 in ACM0016

3.8/ 10
Integrity
5.5
Transparency
1.5
Claim Safety
4.5
Documentation
2.5

Audit Analysis

The Istanbul 3rd Airport Rail System Connection is a large-scale avoidance project (81.6 MtCO₂e over 10 years) with strong permanence characteristics due to its 100-year infrastructure design life, but the available documentation is limited to a PDD and appendix with no verification or monitoring reports. Additionality is assessed via a combined test but lacks independent VVB confirmation, and the 0% leakage deduction rests on a thin 'deemed negligible' justification. The overall evidence base is insufficient to confirm the claimed emission reductions.

Red Flags

  • No VVB is identified and no verification report appears in the document set; additionality is assessed but independently unconfirmed
  • Methodology ACM0016 V6.1 is titled 'Energy Efficiency Improvements in Buildings' yet is applied to a rail-system connection — the applicability to transport infrastructure is not explained in the extracted record
  • FPIC was not conducted (explicitly recorded as false) even though safeguards and benefit-sharing are mentioned, creating a gap in free, prior and informed consent for affected communities
  • No monitoring report or verified ERR figure is available; the 81.6 MtCO₂e claim rests entirely on the ex-ante PDD estimate
  • Low extraction confidence on the two available documents (PDD and appendix) reduces reliability of all extracted values

Credit Vintages

IssuedRetiredAvailable
2023
5,141,84005,141,840
2024
5,740,89905,740,899
2025
5,893,17205,893,172
2026
8,276,80008,276,800
2027
8,586,44108,586,441
2028
8,878,02108,878,021
2029
9,169,64509,169,645
2030
9,461,27509,461,275
2031
9,752,91009,752,910
2032
10,044,549010,044,549
2033
623,0030623,003
Total81,568,555081,568,555

Risk Indicators

Additionality

Combined test present but no VVB confirmation

Permanence

Avoidance project, 100-yr design life, no reversal risk

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, no reassessment date recorded

Safeguards

Grievance & benefit-sharing present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08ACM0016

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents