Istanbul 3rd Airport Rail System Connection by Republic of Türkiye MoTI
#47of 75 in TR#96of 154 in Intl. Carbon Registry (ICR)#3of 5 in ACM0016
Audit Analysis
The Istanbul 3rd Airport Rail System Connection is a large-scale avoidance project (81.6 MtCO₂e over 10 years) with strong permanence characteristics due to its 100-year infrastructure design life, but the available documentation is limited to a PDD and appendix with no verification or monitoring reports. Additionality is assessed via a combined test but lacks independent VVB confirmation, and the 0% leakage deduction rests on a thin 'deemed negligible' justification. The overall evidence base is insufficient to confirm the claimed emission reductions.
Red Flags
- No VVB is identified and no verification report appears in the document set; additionality is assessed but independently unconfirmed
- Methodology ACM0016 V6.1 is titled 'Energy Efficiency Improvements in Buildings' yet is applied to a rail-system connection — the applicability to transport infrastructure is not explained in the extracted record
- FPIC was not conducted (explicitly recorded as false) even though safeguards and benefit-sharing are mentioned, creating a gap in free, prior and informed consent for affected communities
- No monitoring report or verified ERR figure is available; the 81.6 MtCO₂e claim rests entirely on the ex-ante PDD estimate
- Low extraction confidence on the two available documents (PDD and appendix) reduces reliability of all extracted values
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 5,141,840 | 0 | 5,141,840 | |
| 2024 | 5,740,899 | 0 | 5,740,899 | |
| 2025 | 5,893,172 | 0 | 5,893,172 | |
| 2026 | 8,276,800 | 0 | 8,276,800 | |
| 2027 | 8,586,441 | 0 | 8,586,441 | |
| 2028 | 8,878,021 | 0 | 8,878,021 | |
| 2029 | 9,169,645 | 0 | 9,169,645 | |
| 2030 | 9,461,275 | 0 | 9,461,275 | |
| 2031 | 9,752,910 | 0 | 9,752,910 | |
| 2032 | 10,044,549 | 0 | 10,044,549 | |
| 2033 | 623,003 | 0 | 623,003 | |
| Total | 81,568,555 | 0 | 81,568,555 |
Risk Indicators
Combined test present but no VVB confirmation
Avoidance project, 100-yr design life, no reversal risk
0% deduction, 'deemed negligible' only
Project-specific, no reassessment date recorded
Grievance & benefit-sharing present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →