Vai al contenuto principale
HCS Removal Documentazione completa General Methodology v2.0

K. J. Voase and Son

TC-1993 ↗

2.3 / 10
Integrity
2.4
Transparency
2.1
Claim Safety
2.0
Documentation
3.2

Score Breakdown

Integrity

verified The verification report dated 2025-05-16 reports no material findings and no corrective actions required.

missing The baseline method, additionality test type, leakage deduction, and permanence protections are not stated in the extracted documents.

Transparency

verified A named VVB, Control Union Malaysia, is identified and the monitoring period is clearly stated as 2024-01-01 to 2024-12-31.

missing Total ERR claimed and verified are not found, and the registry extract lacks public-facing details on usage monitoring, CORSIA eligibility, and other key MRV fields.

Claim Safety

missing The project’s baseline and leakage treatment are not stated, which raises over-crediting uncertainty for a removal claim.

inferred The registry code is present, but CCP status and CORSIA eligibility are not stated, so double-claim exposure cannot be ruled out.

Documentation

verified The record includes a recent verification report from 2025 and references three source documents, including validation and issuance materials.

missing Extraction confidence is only medium, and many critical fields are missing from the available record, limiting documentation completeness.

Detailed Analysis

Integrity

The verification report dated 2025-05-16 states that no material findings were reported and no corrective actions were required, which is a modest positive. However, the extracted record does not state the additionality test, baseline method, leakage deduction, or any buffer pool or reversal information, so the core integrity case remains weak and incomplete.

Transparency

Transparency is limited because only the VVB name, Control Union Malaysia, and the 2024 monitoring period are clearly identified. The extracted record does not include total ERR claimed or verified, usage monitoring details, or CORSIA eligibility, which leaves the MRV trail incomplete.

Claim Safety

Claim safety is constrained by the absence of a stated baseline method and any quantified leakage treatment, both of which are important for judging over-crediting risk. CCP status and CORSIA eligibility are not stated, so the project cannot be treated as clearly insulated from double-claim concerns.

Documentation

The documentation set appears to include a verification report, validation report, and issuance material, and the verification report is recent. Even so, extraction confidence is only medium and many critical fields are not found in the available record, which lowers confidence in the completeness of the documentation base.

Overall

Overall, this is a low-confidence assessment because the available documents leave too many core questions unanswered. There are no contradictions listed in the extracted record, so no conflict resolution was needed; the main issue is missing evidence rather than conflicting evidence. Because the baseline and additionality evidence are not stated, the project scores poorly on integrity and claim safety despite the absence of reported material findings.

Audit Analysis

The project has very limited extractable evidence in the available verification record, with key items like the baseline method, additionality test, leakage treatment, and permanence safeguards not stated. The verification report shows no material findings, but the absence of core methodological details makes the crediting claim hard to assess confidently.

Project Description

Credits issued: 397

Red Flags

  • Core integrity elements such as the baseline approach, additionality test, and leakage treatment are not stated in the available documents.
  • No buffer pool, reversal history, or safeguard documentation is found in the extracted record, and the registry status does not clarify double-claim risk.

Credit Vintages

Issued Retired Available
2024
397 343 54
Total 397 343 54

Cosa migliorerebbe questo punteggio

  • Provide the full validation and verification evidence for additionality, baseline setting, leakage treatment, and any permanence or buffer arrangements.
  • Publish the issuance and registry details showing verified ERR quantities, CORSIA eligibility, CCP status, and any safeguard documentation such as FPIC or grievance mechanisms.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

No additionality test found

Permanence

No buffer or reversal evidence

Leakage

Leakage treatment not stated

Baseline

Baseline method not stated

Safeguards

No safeguards documented

Double-claim

Registry status unclear

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-12 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti