Kolar Biogas Project
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the project uses a combined additionality test under AMS.I.C.
missing Reversal risk is not addressed, with no buffer pool percentage found and no reversal events detail provided.
Transparency
verified The monitoring period is stated, the VVB is named, and the record includes claimed emission reductions and a verified usage rate from the monitoring report.
missing The extracted record does not provide a verified emission reduction total, and the evidence list is effectively incomplete with only an unspecified source entry.
Claim Safety
verified Leakage is described as quantified in the latest monitoring report, which is better than an unqualified assumption of negligible leakage.
missing The project relies on a project-specific baseline, and contradictions remain on leakage treatment, FNRB method, and usage rate, increasing over-crediting risk.
Documentation
verified The record includes 19 extracted documents, a named VVB, and documented safeguards such as FPIC, grievance mechanism, and benefit sharing.
missing Extraction confidence is only medium, the evidence docs list is not specific, and the crediting period changed across documents, indicating documentation inconsistency.
Detailed Analysis
Integrity
The project has a positive integrity signal because the VVB confirmed additionality and the methodology is identified as AMS.I.C with a combined additionality test. Still, permanence is weakly evidenced: no buffer pool percentage is found and reversal events are marked as not addressed, so the permanence case is incomplete. Leakage is better supported in the latest monitoring report as quantified, but the record also shows an earlier statement that leakage was deemed negligible, which creates uncertainty about how leakage was actually treated.
Transparency
Transparency is moderate because the monitoring period is stated, the VVB is named as 4K Earth Science Private Limited, and the record includes both claimed reductions and a verified usage rate. However, the extracted record does not provide a verified emission reduction total, and the evidence list is not specific, showing only an unspecified source entry. The medium extraction confidence also limits how fully the documentation can be trusted.
Claim Safety
Claim safety is middling because the project uses a project baseline rather than a clearly reassessed standardized baseline, and the latest record does not provide a leakage deduction percentage. The contradictions on leakage justification, usage monitoring method, FNRB method, and usage rate suggest the underlying accounting inputs changed across documents, which raises over-crediting risk. CORSIA eligibility is not stated and CCP status is only noted as not mentioned, so dual-claim risk cannot be ruled out from the extracted record.
Documentation
Documentation is fair but not strong: there are 19 extracted documents, the VVB is identified, and safeguards such as FPIC, grievance mechanism, and benefit sharing are explicitly mentioned. At the same time, extraction confidence is medium, the evidence document list is not specific, and the crediting period differs between documents. The presence of many closed corrective actions is helpful, but the volume of findings and the inconsistent dates reduce confidence in completeness.
Overall
I privileged the latest monitoring report dated 2023-09-13 for leakage treatment and usage monitoring because it is the most recent document in the record, but I discounted confidence because it conflicts with earlier documents that described leakage as negligible, used self-reporting, and applied a local field FNRB method. I also privileged the latest crediting-period statement, yet the earlier period mismatch remains a material reliability issue. Because these contradictions affect core accounting inputs, the scores are held to a moderate level rather than a high one.
Audit Analysis
This biogas project has some strengths: additionality was confirmed by the VVB, safeguards are documented, and leakage is described as quantified in the latest monitoring record. However, the record also shows several unresolved reliability issues, including contradictions on leakage treatment, usage monitoring, FNRB method, usage rate, and crediting period, which reduce confidence in the claims.
Project Description
Developer: myclimate Foundation Type: Biogas - Heat Size: Small Scale Methodology: AMS-I.C. Thermal energy production with or without electricity Crediting period: 2012-04-01 → 2022-03-31 Estimated annual credits: 24978 tCO2e SDGs: Goal 7: Affordable and Clean Energy, Goal 5: Gender Equality, Goal 13: Climate Action, Goal 2: Zero Hunger, Goal 3: Good Health and Well-Being, Goal 4: Quality Education, Goal 12: Responsible Production and Consumption, Goal 15: Life On Land, Goal 1: No Poverty, Goal 8: Decent Work and Economic Growth, Goal 17: Partnerships for the Goals
Red Flags
- The monitoring record contains multiple contradictions with earlier documents on leakage, usage monitoring, FNRB method, usage rate, and crediting period.
- No verified emission reduction figure is available in the extracted record, and reversal handling is not addressed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 5,623 | 0 | 5,623 | |
| 2013 | 19,671 | 0 | 19,671 | |
| 2014 | 30,031 | 0 | 30,031 | |
| 2015 | 36,784 | 0 | 36,784 | |
| 2016 | 44,894 | 0 | 44,894 | |
| 2017 | 49,141 | 0 | 49,141 | |
| 2018 | 50,320 | 0 | 50,320 | |
| 2019 | 50,923 | 0 | 50,923 | |
| 2020 | 51,248 | 0 | 51,248 | |
| 2021 | 45,672 | 13,125 | 32,547 | |
| 2022 | 13,781 | 5,986 | 7,795 | |
| Total | 398,088 | 19,111 | 378,977 |
Cosa migliorerebbe questo punteggio
- Provide a reconciled audit trail explaining the contradictions in leakage treatment, usage monitoring, FNRB method, usage rate, and crediting period, with the latest authoritative document clearly identified.
- Disclose the verified emission reduction total, buffer pool or reversal treatment, and explicit CORSIA/CCP status in the registry or verification package.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality test
No buffer pool or reversal treatment stated
Leakage quantified but contradictory treatment
Project baseline with no reassessment date
FPIC, grievance mechanism, and benefit sharing documented
CORSIA and CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
validation
- Verification Report_5th monitoring period_01.01.2017 to 31.12.2017_v2.1.pdf
- Verification Report_3rd monitoring period_01.01.2015 to 31.12.2015_v4.pdf
- FVR_Kolar Biogas Project_Ver1.pdf
- Verification Report_1st monitoring period_04.01.2012 to 31.12.2013_v1.1.pdf
- Verification Report_2nd monitoring period_01.01.2014 to 31.12.2014_v2.1.pdf
- GS Verification report _Biogas project Uttarakhand India_PP_CleanMode.pdf
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →