Luoding BCCY New Power CO., Ltd. MSW biogas to electricity generation project
#41of 268 in Biogas#405of 1084 in China#472of 1339 in Verra (VCS)#33of 159 in ACM0001
Audit Analysis
A registered VCS biogas-to-electricity project in China with a confirmed combined additionality test and measured project-specific baseline, but hampered by eight material findings requiring corrective action, a thin 0% leakage justification, and several key parameters (FNRB, usage rate, feedstock sustainability) not stated in the available record. The project is functional and verified by a reputable VVB, but the documentation quality gaps and missing permanence safeguards (no buffer pool stated) limit confidence in long-term credit integrity.
Red Flags
- Eight material findings in the verification report require corrective action, including incorrect project start date, missing DOCj value for food waste fraction, and unjustified LFG system efficiency parameter
- Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis, while an appendix document references a 'quantified' approach — an unresolved inconsistency
- FNRB value, usage rate (assumed and verified), and feedstock sustainability are all absent from the extracted record, preventing independent verification of key emission factors
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test confirmed by VVB
no reversal events reported
0% deduction, 'deemed negligible' only; appendix inconsistency
Project-specific measured baseline; reassessment not yet due
FPIC conducted, grievance mechanism present, safeguards mentioned
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →