Skip to main content
CCLand use (AFOLU)ColombiaGeneral Methodologyv2.1

Makaro Ap+ro

ECO-52 ↗

#9of 80 in ARR (afforestation)#38of 124 in Colombia#34of 99 in CerCarbono (CC)

5.3/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
5.0

Audit Analysis

Makaro Ap+ro is a Colombian REDD+ project with VVB-verified additionality, a jurisdictional baseline reassessed in 2023, and no reported reversal events, but it is undermined by numerous material findings including a stakeholder association withdrawal (ASATIQ), baseline calculation errors, a 0% leakage deduction that is questionable for an Amazon REDD+ project, and a buffer pool that was reduced from 15% to 10.3% between successive verification reports. The project delivered approximately 105% of its pro-rata ex-ante expectation for the 2021–2023 monitoring period, but the volume of corrective actions and inter-document contradictions erode confidence in the underlying data.

Red Flags

  • ASATIQ association withdrew from the project after 21 mandate contracts had been signed, raising concerns about the robustness of stakeholder engagement and benefit-sharing claims
  • Historical deforestation rate was initially calculated using the total Amazon biome area instead of the reference region area, a substantive baseline error that was later corrected
  • Leakage deduction of 0% with a 'deemed negligible' justification is questionable for a REDD+ project in the Colombian Amazon, and the monitoring report contradicts this by stating leakage was 'quantified'
  • Buffer pool percentage decreased from 15% (verification report, Dec 2024) to 10.3% (verification report, Feb 2025), reducing the permanence safety margin
  • Low extraction confidence across the document set, combined with six inter-document contradictions, limits the reliability of the extracted data

Credit Vintages

IssuedRetiredAvailable
2018
20,017020,017
2019
14,860014,860
2020
18,142018,142
2021
6400640
2022
8530853
2023
9520952
Total55,464055,464

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Buffer pool reduced to 10.3%; no reversals

Leakage

0% deduction, 'negligible' justification questioned

Baseline

Jurisdictional, reassessed 2023, but calc errors found

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents