N2O abatement project at nitric acid plant No. 11 at African Explosives Ltd. (AEL), South Africa
Developer: AEL Mining Services Limited
#214of 691 in Methane#48of 134 in South Africa#2413of 5732 in CDM (UNFCCC)#11of 18 in AM0034
Score from methodology v2.1 (analysis of 23 Sep 2026). Re-assessment under v2.2 pending.
Assessment
Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.
Findings
Risk Indicators
🔒
🔒
🔒
🔒
🔒
🔒
Score Breakdown
Score factors per dimension are a Premium feature — Unlock with Premium
Detailed Analysis
The detailed per-dimension analysis is a Premium feature — Unlock with Premium
Evidence
Eligibility & market
Transactions in the CDM registry are discontinued as of 31 December 2026 (UNFCCC, checked 6 October 2026). This page keeps the project's record and our analysis.
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Not published
This registry does not publish CORSIA eligibility per project.
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 1,041,434 | 0 | 1,041,434 | |
| 2014 | 298,728 | 0 | 298,728 | |
| 2015 | 317,808 | 0 | 317,808 | |
| 2016 | 298,109 | 0 | 298,109 | |
| 2017 | 148,609 | 0 | 148,609 | |
| 2018 | 271,793 | 0 | 271,793 | |
| Total | 2,376,481 | 0 | 2,376,481 |
Methodology versions used
The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.
2008–2009AM0034 v2.0since replaced by v5.1.1
monitoring report
official page · verified on
2009–2010AM0034 v2.0since replaced by v5.1.1
monitoring report
official page · verified on
2010–2011AM0034 v2.0since replaced by v5.1.1
monitoring report
official page · verified on
2011AM0034 v2.0since replaced by v5.1.1
monitoring report
official page · verified on
2011–2012AM0034 v2.0since replaced by v5.1.1
monitoring report
official page · verified on
2012–2013AM0034 v2.0since replaced by v5.1.1
monitoring report
official page · verified on
2013–2014AM0034 v2.0since replaced by v5.1.1
monitoring report
official page · verified on
2014–2016AM0034 v2.0since replaced by v5.1.1
monitoring report
official page · verified on
2016AM0034 v2.0since replaced by v5.1.1
monitoring report
official page · verified on
2016–2018AM0034 v2.0since replaced by v5.1.1
monitoring report
official page · verified on
- AM0034: Withdrawn (CDM / UNFCCC) · replaced byACM0019 · official page · verified on
A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
Profile & governance
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →