Nanba Associated Gas Processing Plant And The Auxiliary Engineering
Score Breakdown
Integrity
verified The validation/verification record indicates additionality was confirmed by the VVB using an investment test.
missing Baseline is project-specific and the timing of any baseline reassessment is not stated in available documents; leakage is said to be quantified but the deduction value is not found in the extracted record.
Transparency
verified A named VVB (ERM Certification and Verification Services) and a defined monitoring period are provided in the monitoring report.
missing Key MRV outputs (claimed and verified ER totals) are not found in the extracted record, reducing auditability.
Claim Safety
verified The project is explicitly marked as not CORSIA-eligible, reducing aviation-claim channel risk.
missing Over-crediting risk cannot be well screened because verified ER totals and leakage deduction values are not found in the extracted record, and the crediting period is inconsistent across documents.
Documentation
verified Multiple core documents are available (PDD, validation report, monitoring report) and extraction confidence is high.
missing The extracted record shows missing key quantified fields (ER totals, leakage deduction, buffer/pooling where relevant) and contains a crediting-period contradiction.
Detailed Analysis
Integrity
The validation/verification record indicates additionality was assessed via an investment test and confirmed by the VVB (validation/verification documentation referenced in the extracted record). The baseline approach is project-specific (PDD), and the timing of any baseline reassessment is not stated in available documents, which weakens confidence in baseline validity over time. Leakage is described as quantified (monitoring report), but the actual leakage deduction percentage is not found in the extracted record, limiting the ability to judge whether deductions were appropriately applied. No material findings or corrective actions are reported (monitoring report), which is positive but does not substitute for missing quantifications.
Transparency
The monitoring report provides a clear monitoring period (2012-05-29 to 2012-12-06) and identifies the VVB as ERM Certification and Verification Services, supporting basic traceability. However, neither total claimed emission reductions nor total verified emission reductions are found in the extracted record, preventing independent cross-checking of issuance quantities. The registry is listed as CDM while the standard is VCS, which adds contextual ambiguity about where complete issuance and MRV data should be checked, even though it is not presented as a direct contradiction here.
Claim Safety
The project is explicitly not CORSIA-eligible, which reduces the risk of high-profile aviation claims (extracted record). CCP status is not stated in available documents, leaving uncertainty about alignment with higher-integrity labels. Over-crediting risk cannot be robustly assessed because verified ER totals are not found in the extracted record and leakage is said to be quantified without the deduction value (monitoring report). The inconsistency in crediting period across documents further increases the risk that stakeholders misunderstand what period the credits legitimately cover.
Documentation
The extracted record references key document types (PDD, validation report, monitoring report) and indicates high extraction confidence, supporting a moderate documentation score. Nonetheless, several critical quantitative fields are not found in the extracted record (claimed/verified ER totals, leakage deduction percentage, buffer pool percentage where relevant), which limits evaluability. Safeguards-related elements (FPIC, grievance mechanism, benefit sharing) are not evidenced in the extracted record, reducing completeness from a quality-assurance perspective.
Overall
Overall quality is moderate-low because, while additionality is VVB-confirmed, the extracted record lacks the core numbers needed to validate credit volumes and leakage treatment. The key contradiction is the crediting period: the monitoring report (2014-04-14) shows 2012-05-29 to 2012-12-06, while the PDD (2012-10-19) states 2012-04-12 to 2021-04-11. I privilege the monitoring report for the specific issuance/monitoring window because it is the operational MRV document tied to the reported period, but the discrepancy signals documentation reliability issues and increases over-crediting/eligibility interpretation risk, so scores are adjusted downward.
Audit Analysis
The project has a basic additionality case (investment test) that was confirmed by the VVB, but key quantifications needed to judge crediting integrity (verified ERs, leakage deduction, baseline reassessment) are not present in the extracted record. Safeguards and grievance provisions are not evidenced, and a material inconsistency exists on the length of the crediting period across documents, increasing over-crediting and interpretation risk.
Project Description
The Nanba Associated Gas Processing Plant and Auxiliary Engineering in Daqing City, China, recovers and uses gas from oil wells that would otherwise be vented. The recovered gas is processed into dry gas and condensate, reducing greenhouse gas emissions. The project does not use gas-lift technology or gas injection infrastructure.
Red Flags
- Crediting period is inconsistent between the monitoring report (2012-05-29 to 2012-12-06) and the PDD (2012-04-12 to 2021-04-11), creating uncertainty about the eligible period for issuance.
- Verified emission reductions are not found in the extracted record (no verified ER total), limiting the ability to assess over-crediting risk.
- Leakage is described as quantified, but the actual leakage deduction percentage is not found in the extracted record.
- Safeguards, FPIC, and a grievance mechanism are not evidenced in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 224,553 | 212,502 | 12,051 | |
| Total | 224,553 | 212,502 | 12,051 |
Cosa migliorerebbe questo punteggio
- Disclose and reconcile the crediting period across the PDD and monitoring/verification documentation, explicitly stating which period is eligible for VCS issuance and why.
- Provide the claimed and verified emission reduction totals for the monitoring period, along with the quantified leakage deduction percentage and calculation summary, to enable independent checks.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
Investment test confirmed by VVB
Reversal/buffer provisions not evidenced
Quantified but deduction value missing
Project-specific baseline; reassessment timing unclear
No FPIC/grievance safeguards evidenced
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →