Nanyang Dongjia Composting Project in Fangcheng County
#124of 1329 in Industrial#234of 1084 in China#280of 1339 in Verra (VCS)#8of 43 in AMS-III.F
Audit Analysis
The Nanyang Dongjia Composting Project is a registered VCS project using the simplified AMS-III.F methodology for manure composting, with VVB-confirmed additionality via an investment test and a measured project-specific baseline. The project over-delivered relative to its ex-ante estimate (175% of expectation for the first monitoring period), which is a positive signal, but the 0% leakage deduction is contradicted by the validation report and multiple material findings (seven CARs) reveal gaps in the investment analysis and monitoring protocol. Overall, the project is moderately robust but carries documentation and leakage-justification weaknesses that limit confidence.
Red Flags
- Leakage deduction of 0% is justified as 'quantified' in the monitoring report, yet the validation report (2023-01-31) states leakage was 'not addressed' — a direct contradiction that undermines the credibility of the zero-deduction claim.
- Seven material findings (CARs) were raised during verification, including missing investment-analysis dates, unvalidated input values, and absent monitoring requirements from AMS-III.F paragraphs 33–34, indicating the additionality and MRV framework was not fully robust at the time of verification.
- No buffer pool percentage or reversal-event history is stated in any available document, leaving the permanence risk for this 15-year crediting period unquantified.
- The validation report and verification report both carry the date 2024-12-05 in the ERR contradiction, which is inconsistent with the validation report's 2023-01-31 date in the leakage contradiction, raising questions about document dating and data integrity.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 9,544 | 0 | 9,544 | |
| 2021 | 57,741 | 0 | 57,741 | |
| 2022 | 36,533 | 0 | 36,533 | |
| Total | 103,818 | 0 | 103,818 |
Risk Indicators
VVB-confirmed but CARs on investment analysis
mixed evidence / unresolved risk
0% deduction contradicted across documents
Project-specific, measured; reassessment not yet due
FPIC, grievance mechanism, and safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →