Nepal Biogas Support Program - CPA 5: 19,842 digesters
GS-1491 ↗ · current registry ID: GS3566
#14of 268 in Biogas#8of 101 in Nepal#199of 1801 in Gold Standard (GS)
Audit Analysis
A large-scale Nepal biogas PoA (19,842 digesters) under Gold Standard with VVB-confirmed additionality, a locally measured FNRB, and a quantified 5% leakage deduction. However, the absence of a stated buffer pool, a project-specific baseline last reassessed in 2018, an extensive list of material findings (18 items including calculation errors and missing QA/QC), and a 5.9× over-delivery relative to the pro-rata lifetime expectation introduce meaningful uncertainty. The project is functional but carries moderate quality and permanence risks.
Red Flags
- Verified ERR of 381,686 tCO₂e for the 2022 monitoring period is approximately 5.9× the pro-rata expectation of ~65,103 tCO₂e (455,721 lifetime ex-ante ÷ 7-year crediting period), raising questions about the conservatism of the ex-ante estimate or potential calculation issues
- 18 material findings in the 2025 verification report, including errors in ER calculation spreadsheets, use of an expired MR template (v2.0), missing QA/QC procedures, and untrained personnel involved in monitoring
- Additionality test type is not stated in any document; the 2020 validation report recorded additionality as unverified, while the 2025 verification report confirms it — the basis of the later confirmation is unclear
- CCP status and CORSIA eligibility are both not stated, leaving dual-channel and double-claiming risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 1,359 | 0 | 1,359 | |
| 2017 | 56,164 | 0 | 56,164 | |
| 2018 | 54,974 | 0 | 54,974 | |
| 2019 | 64,500 | 0 | 64,500 | |
| 2020 | 60,102 | 0 | 60,102 | |
| 2021 | 64,282 | 64,282 | 0 | |
| 2022 | 60,097 | 12,104 | 47,993 | |
| Total | 361,478 | 76,386 | 285,092 |
Risk Indicators
VVB-confirmed but test type unstated; 2020 VR contradicts 2025 VR
no reversal events but no permanence mechanism
5% quantified deduction with justification
Project-specific baseline, last reassessed 2018
Grievance mechanism and benefit sharing present; FPIC not stated
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →