Ningxia Angli Lingwu Photovoltaic Grid Connected Power Plant Project
Score Breakdown
Integrity
verified Additionality is confirmed by the VVB using an investment test (validation documentation referenced in the extracted record).
missing Baseline is project-specific and the baseline reassessment timing was not found in the extracted record; leakage handling is inconsistent across documents.
Transparency
verified Key MRV elements are present (methodology ACM0002 v13.0.0, monitoring period 2012-12-01 to 2018-11-30, VVB named).
missing Contradictions in ER figures and safeguards disclosures reduce transparency and comparability across reporting vintages.
Claim Safety
verified The project is explicitly not CORSIA-eligible, reducing one channel of downstream claim risk.
missing Over-crediting/greenwashing risk is elevated by conflicting ER totals and unclear leakage treatment in later monitoring documentation.
Documentation
verified A relatively complete document set is referenced (PDD, validation report, monitoring report, issuance) with high extraction confidence and 14 documents used.
missing Internal inconsistencies across documents (ERs, crediting period, safeguards) reduce confidence in the documentation set as a coherent basis for claims.
Detailed Analysis
Integrity
The validation documentation in the extracted record indicates additionality was assessed via an investment test and confirmed by the VVB (Shenzhen CTI International Certification Co., Ltd.). The baseline approach is project-specific (ACM0002), and the extracted record does not state when the baseline was last reassessed, which weakens robustness over a long crediting horizon. Leakage is a key integrity uncertainty because the validation report (2013-10-16) describes leakage as “quantified,” while the monitoring report (2021-08-17) says leakage was “not addressed,” and no leakage deduction percentage was found in the extracted record.
Transparency
The extracted record provides core MRV identifiers: methodology ACM0002 v13.0.0, a defined monitoring period (2012-12-01 to 2018-11-30), and a stated grid emission factor (0.89635) with a referenced year (2011). The monitoring report dated 2021-08-17 reports total emission reductions of 286,088 and the extracted record also lists the verified total as 286,088, but other documents report materially different totals, reducing transparency and traceability across vintages. No material findings or corrective actions are reported in the extracted record, which is positive for MRV process quality but does not resolve the numerical inconsistencies.
Claim Safety
The project is explicitly marked as not CORSIA-eligible, which reduces the risk of CORSIA-related double-claim pathways. However, claim safety is weakened by conflicting ER quantities across documents (including differences between validation and monitoring-era figures), which increases perceived over-crediting risk. Leakage treatment inconsistency (validation report 2013-10-16 “quantified” vs monitoring report 2021-08-17 “not addressed”) further raises the risk that credited reductions could be overstated or insufficiently justified.
Documentation
The extracted record references a reasonably complete evidence set (monitoring report, validation report, PDD, and issuance) and indicates 14 documents were used with high extraction confidence. The VVB is clearly identified (Shenzhen CTI International Certification Co., Ltd.), supporting auditability. Nevertheless, multiple contradictions across documents (ER totals, crediting period dates, and safeguards/grievance disclosures) indicate documentation coherence issues that reduce confidence in relying on any single figure without reconciliation.
Overall
Overall scoring is pulled down primarily by cross-document contradictions that affect core credit quantification and safeguards disclosures. For ER totals, the more recent monitoring report (2021-08-17) value of 286,088 was privileged over the older monitoring report (2013-10-09) value of 38,836, but the existence of both figures still indicates reliability risk; similarly, for verified ERs, 286,088 (validation report 2021-08-17) was privileged over 107,929 (validation report 2021-07-23) because it is later-dated, though the discrepancy remains material. For leakage and safeguards/grievance/FPIC, the later monitoring report (2021-08-17) values were privileged as the most recent disclosure, but the reversals from earlier documents suggest inconsistent reporting practices and warrant a downward adjustment to integrity, transparency, and claim-safety.
Audit Analysis
This is a VCS grid-connected solar PV project using ACM0002 with VVB-confirmed additionality and no reported material findings in the extracted record. However, multiple cross-document inconsistencies (especially around ER quantities, crediting period, and safeguards) reduce confidence in the reliability of key claims and weaken integrity and claim-safety.
Project Description
The Ningxia Angli Lingwu Photovoltaic Grid Connected Power Plant Project is a new solar power plant located in Ningxia Hui Autonomous Region. It has an installed capacity of 39MWp and will generate 54,000MWh of electricity annually while reducing greenhouse gas emissions by 48,402 tCO2e by replacing fossil fuel-fired power plants connected to the NWPG.
Red Flags
- Large discrepancies in reported/verified emission reductions across documents (e.g., 286,088 vs 38,836 vs 107,929) indicate data reliability risk.
- Leakage treatment is inconsistent across documents (described as “quantified” in one validation report but “not addressed” in a later monitoring report).
- Crediting period dates conflict between the PDD and later monitoring documentation, creating uncertainty about the applicable crediting timeline.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 130 | 130 | 0 | |
| 2012 | 41,985 | 41,985 | 0 | |
| 2013 | 51,728 | 51,728 | 0 | |
| 2014 | 53,883 | 53,883 | 0 | |
| 2015 | 47,620 | 47,565 | 55 | |
| 2016 | 46,812 | 46,812 | 0 | |
| 2017 | 41,755 | 39,209 | 2,546 | |
| 2018 | 43,909 | 23,100 | 20,809 | |
| 2019 | 47,949 | 13,684 | 34,265 | |
| 2020 | 48,924 | 379 | 48,545 | |
| 2021 | 10,732 | 10,732 | 0 | |
| Total | 435,427 | 329,207 | 106,220 |
Cosa migliorerebbe questo punteggio
- Publish a reconciliation note (or VVB clarification) that explains the differing ER totals across the 2013 and 2021 documents and clearly ties each figure to a specific monitoring/vintage/issuance scope.
- Provide a clear, consistent leakage assessment in the monitoring documentation (including whether leakage is applicable under ACM0002 for this project and any resulting deduction), and align safeguards/FPIC/grievance disclosures across reporting periods.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project; no reversals reported
Inconsistent leakage treatment across documents
Project-specific baseline; reassessment timing unclear
Safeguards/FPIC/grievance inconsistently reported
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →