Novocarbo Rhine

PUR-181017 ↗

#39of 61 in Biochar#5of 7 in Germany#81of 111 in Puro.earth (PUR)

4.1/ 10
Integrity
3.8
Transparency
4.5
Claim Safety
3.5
Documentation
5.0

Audit Analysis

Novocarbo Rhine is a German biochar removal project under the Puro.earth standard with a 1,000-year permanence claim and VVB-confirmed additionality, but the verification report identifies six material findings centred on an incomplete LCA that omits upstream wood-harvesting, chipping, and transport emissions. A severe internal contradiction in the verified ERR figures (176,869 vs 435 tCO₂e within the same report) and the absence of any leakage treatment or buffer pool raise substantial over-crediting and permanence concerns that are not yet resolved.

Red Flags

  • Six material findings in the verification report (2025-05-07) indicate the LCA omits wood harvesting, chipping, and transport emissions, meaning net removals may be materially overstated
  • Internal contradiction in the same verification report: total ERR claimed/verified appears as both 176,869 and 435 (tCO₂e), a ~400× discrepancy with no unit clarification
  • Leakage is explicitly not addressed and no deduction is applied, despite biochar production involving feedstock sourcing and transport where displacement is plausible
  • No buffer pool percentage is stated and no reversal-event data is available, leaving the 1,000-year permanence claim unbacked by a quantified safety margin
  • Eight corrective actions remain open, including the need for an EBC Sink Certificate covering factory-gate-to-grave emissions and a Puro Earth written statement accepting the inferior moisture level used in calculations

Credit Vintages Exhausted

IssuedRetiredAvailable
2021
2352350
2022
1901900
2023
7007000
2024
1691690
Total1,2941,2940

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

1,000-yr claim, no buffer pool or reversal data

Leakage

Not addressed, no deduction applied

Baseline

Project-specific, no reassessment date stated

Safeguards

Mentioned but no FPIC, no grievance mechanism

Double-claim

CORSIA false; CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents