Papop Biogas and Renewable Energy Project in Thailand
GS-690 ↗ · current registry ID: GS3992
#197of 268 in Biogas#39of 48 in Thailand#1466of 1801 in Gold Standard (GS)#5of 7 in ACM0014
Audit Analysis
The Papop Biogas project in Thailand has VVB-confirmed additionality and no reported reversal events, but is undermined by a project-specific modeled baseline, a 0% leakage deduction, multiple material findings (including repeated plant shutdowns for BOT asset transfer), 18 outstanding corrective actions, and a significant discrepancy between the PDD and monitoring report on claimed emission reductions. The overall picture is one of a technically verified project with substantial documentation and data-reliability gaps that limit confidence in the credit figures.
Red Flags
- Claimed ERR of 278,907 tCO2e in the monitoring report (Oct 2024) contradicts the PDD figure of 90,321 tCO2e (Jan 2024) — a 3× discrepancy that is not explained in the extracted record
- Plant was shut down for BOT asset transfer during July 2021–Feb 2022 and again from April 2023–Dec 2024, with no monitoring data collected during the second shutdown; an arbitration decision on VER rights was made after the BOT period
- 18 corrective actions remain outstanding, including calibration gaps for flow meters and gas analyzers, a CODPJ,y calculation error, and missing monitoring methodology details
- Grid emission factor differs between the validation report (0.4401, Jun 2024) and the verification report (0.5692, Dec 2024), directly affecting the baseline calculation
- FPIC was not conducted despite safeguards and benefit-sharing being mentioned in the project documentation
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 83,770 | 83,770 | 0 | |
| 2017 | 48,306 | 29,067 | 19,239 | |
| 2018 | 62,980 | 3,519 | 59,461 | |
| 2019 | 78,200 | 19,726 | 58,474 | |
| 2020 | 56,069 | 0 | 56,069 | |
| 2021 | 33,352 | 3,794 | 29,558 | |
| Total | 362,677 | 139,876 | 222,801 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, quantified but thin justification
Project-specific, modeled, reassessed 2024
Grievance & benefit-sharing present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →